Similar Projects
Maple Lane Resurfacing - 14 Mile Road to Volpe - City of Sterling Heights
Infrastructure, Alteration
Conception
$1,800,000 est. value
Sterling Heights, MI 48312

Water Main Replacement Medville - City of Sterling Heights
Infrastructure
Conception
$1,500,000 est. value
Sterling Heights, MI 48312

Construction Manager / General Contractor (CM/GC) Service
Infrastructure
Design
$300,000 CJ est. value
Lenox, MI 48050

Northbound Gratiot Avenue Water Main Replacement
Infrastructure
Bidding
$1,000,000 est. value
Clinton Township, MI 48035

Ryan Road Pavement Reconstruction (9 Mile Road to 10 Mile Road)
Infrastructure
Bidding
$2,000,000 CJ est. value
Warren, MI 48092

Downtown Development Authority: Downtown Romeo Streetscape Fall Lighting
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Romeo, MI 48065

23 Mile Road Water Main Replacement
Infrastructure
Post-Bid
Macomb, MI

Summer 2022 Sitework
Infrastructure
Post-Bid
Roseville, MI 48066

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

23 Mile Road Water Main
Results
Chesterfield, MI

Water Service Installations and Repairs
Term Contract, Infrastructure
Post-Bid
Sterling Heights, MI

Maintenance of Irrigation and Park Restroom Water Systems
Results
Sterling Heights, MI

2022-2023 Sewer and Water Repair Supplies and Water Meters Contract
Term Contract
Post-Bid
Saint Clair Shores, MI 48080

Check Valve Replacement
Results
Warren, MI 48089

2022-2025 Commercial Water Meter Testing, Repair and Replacement Contract
Term Contract
Post-Bid
Saint Clair Shores, MI

Last Updated 07/25/2022 03:01 PM
Project Title

Water Extension 32 Mile and Powell Roads

Physical Address View project details and contacts
City, State (County) Washington, MI 48094   (Macomb County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,156,162 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Addendum 1 and 2 are available from the owner. The project consists of installing approximately 7,900 lineal feet of 16-inch water main connecting to the existing 16-inch water main on the north side of 31 Mile Road, at Powell Road to approximately 2,030 feet west of Powell Road on 32 Mile Road. The project also includes approximately 95 lineal feet of 12-inch water main under 32 Mile Road and connection to the Village of Romeo water system, in accordance with the Bidding Documents prepared by the Engineer. Question Acceptance Deadline 05/31/2022 04:00 PM EDT Questions are submitted online No - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 50 % - Payment Bond 100 %

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents