Similar Projects
Blair Street, South - 11128 - City of Madison
Infrastructure
Conception
$1,627,000 CJ est. value
Madison, WI 53703

Senior Center Building Improvements - 12434 - City of Madison
Renovation, Infrastructure
Conception
$330,000 CJ est. value
Madison, WI 53703

Diventures / Sun Prairie
New Construction, Infrastructure - 10,500 SF
Design
$2,500,000 CJ est. value
Sun Prairie, WI 53590

Monona Drive Mixed-Use Development
Demolition, New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Madison, WI 53716

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53711

Ohmeda Drive (New Street)
Infrastructure
Bidding
$600,000 CJ est. value
Madison, WI 53715

Phased Modernization of the USGS National Wildlife Health Center in Madison - US Geological Survey (USGS) - Western Ecological Research Center
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Madison, WI 53711

Crowley Station Crowley Concrete Access Walk
Infrastructure
Post-Bid
$450,000 CJ est. value
Madison, WI 53703

Verona Technology Park - East Public Streets
Infrastructure
Results
$85,000 est. value
Verona, WI

South Syene Road Reconstruction (Aurora to Nannyberry Park) Project
Infrastructure
Results
$376,000 est. value
Fitchburg, WI 53711

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Oliv Madison
Demolition, New Construction, Infrastructure - 23,229 SF
Pending Verification
$100,000,000 CJ est. value
Madison, WI 53703

University Avenue Duplexes
Demolition, New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Middleton, WI 53562

Park Street, South / Olin To Railroad - 11133 - City of Madison
Infrastructure
Conception
$458,000 CJ est. value
Madison, WI 53715

Last Updated 02/14/2024 12:00 PM
Project Title

Pumping Station 17 Forcemain Relief Phase 2

Physical Address View project details and contacts
City, State (County) Verona, WI 53593   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $9,376,630 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Pre-Qualification: Yes Est. Value: $ 9,400,000.00 Est. Value Notes: Per Engineers Estimate The contractor shall construct and test approximately 7,959 lineal feet of 24-inch sanitary forcemain, 3,112 lineal feet of 36 sanitary sewer interceptor, 222 of 24-inch sanitary sewer interceptor, and appurtenances located in the City of Verona and Town of Verona. The sewer installation will necessitate construction in wetlands and four creek crossings of the Badger Mill Creek. Additionally, 597 lineal feet of trenchless installation at County Highway Old PB and U.S. Highway 18/151 are anticipated. The project will install new forcemain and interceptor sewer manholes, including replace an existing Town of Verona 8-inch sewer which will contain a monitoring manhole. The project also includes extension of the City of Verona Lower Badger Mill Creek Path which will consist of a prefabricated steel truss pedestrian bridge, an asphalt path, and an existing bridge removal. Other items included in the project include erosion control, dewatering, tree removals, traffic control, storm water, site restoration, and other miscellaneous items of work. All questions regarding this project shall be directed to Theran Jacobson, Project Engineer, Madison Metropolitan Sewerage District, phone: 608-471-2999, e-mail: theranj@madsewer.org

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents