Similar Projects
S. Parker Road Sidewalk Improvements
Infrastructure
Bidding
$540,000 to $600,000 est. value
Aurora, CO 80040

2021 Trails Rehabilitation Project
Infrastructure
Bidding
Greenwood Village, CO

Reunion Ridge Filing No. 1 District Improvements
Post-Bid
Less than $13,000,000 est. value
Centennial, CO

Arapahoe County Justice Center West Employee Parking Lot Slope Stabilization and Full Depth Reclamation
Post-Bid
Centennial, CO 80112

Centennial Center Park Drainage Construction
Results
Centennial, CO 80112

Orchard Road Trail
Results
$350,000 to $400,000 est. value
Centennial, CO 80112

Concrete Utility Project
Infrastructure
Bidding
Englewood, CO

Arapahoe County Covered Walkways
Post-Bid
Centennial, Littleton, CO 80120

Ramp Safety Improvements at the Southbound I-225 at Parker Road
Results
$1,000,000 to $5,000,000 est. value
CO

Greenwood Gulch Undercrossing
Post-Bid
Centennial, CO 80111

Englewood Recreation Center Water Main, Fire Hydrant Assembly and ADA Ramp Installation
Results
Englewood, CO 80110

Retaining Wall Installation Project
Post-Bid
CO

University Boulevard (SH177) Sidewalk Infill
Results
Greenwood Village, CO 80112

Crossroads Overlot Grading
Post-Bid
Greenwood Village, CO

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

Last Updated 06/11/2021 05:55 PM
Project Title

Greenwood Gulch Undercrossing Improvements

Physical Address View project details and contacts
City, State (County) Greenwood Village, CO   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project includes the construction of a grouted boulder drop structure, riprap revetment, a concrete structural channel under the bridge, a concrete pedestrian trail, and lighting under the bridge for the pedestrian trail.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents