Similar Projects
Race Street Washington Street to California Avenue - 40142 - City of Urbana
Infrastructure
Conception
$545,000 CJ est. value
Urbana, IL 61801

Race Street Washington Street to California Avenue - 40142 - City of Urbana
Infrastructure
Conception
$545,000 CJ est. value
Urbana, IL 61801

Satellite Jail Consolidation Plan - Champaign County
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Urbana, IL 61801

Champaign County Detention Center Expansion
Addition, Demolition, Infrastructure
Design
$3,000,000 CJ est. value
Urbana, IL 61802

Superstructure Removal at TR 258
Infrastructure
Bidding
$500,000 CJ est. value
Champaign, IL 61821

South Mahomet Road Utility Extensions
Post-Bid
Mahomet, IL 61853

2021 Infrastructure Maintenance
Post-Bid
Champaign, IL

2021 Bituminous Street Improvements
Results
Champaign, IL

2021 Asphalt Street Improvements
Results
Champaign, IL

Indian Grocery Store
Renovation, Alteration - 5,100 SF
Construction
Champaign, IL 61820

Interchange Reconstruction: I-57
Demolition, New Construction, Infrastructure
Construction
$125,999,995 CJ est. value
Champaign, IL 61822

Modernize and Restructure the Urbana-Champaign Campus Library - University of Illinois
Renovation, Infrastructure
Pending Verification
$54,000,000 CJ est. value
Urbana, IL 61801

High Density Storage Addition Undergraduate Library / University of Illinois-Urbana-Champaign
Addition, Infrastructure, Build-out
Pending Verification
$54,500,000 CJ est. value
Champaign, IL 61820

Lincoln Avenue South of Wascher Drive To South of Killarney - City of Urbana
Infrastructure
Conception
$1,930,550 CJ est. value
Urbana, IL 61801

2021 Asphalt Sealing
Post-Bid
Less than $15,000 est. value
Champaign, Urbana, IL 61822

Last Updated 09/08/2022 12:32 PM
Project Title

Windsor Road Resurfacing

Physical Address View project details and contacts
City, State (County) Urbana, IL 61801   (Champaign County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 8, 2022, a general contractor has been awarded and construction is almost complete. General contractor information has not been disclosed. *The closed solicitation has been included below for reference: Sealed BIDS for the construction of Windsor Road Resurfacing (Section 21-00637-00-RS) including: hot-mix asphalt surface removal and replacement, new aggregate wedge shoulders, detector loop replacement The plans and proposals are each a call for bids containing all requirements governing the letting and performance of the particular contract including but not limited to any applicable requirements for the payment of prevailing rates of wages for labor as required by law. Any questions regarding individual plans and proposals should be directed to the City of Urbana Public Works Department. All bidders are required to provide evidence of current prequalification with the Illinois Department of Transportation. Each proposal shall be accompanied by a bid bond according to BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals. All bidders are hereby notified that the City of Urbana is required to affirmatively insure that the contract, entered into pursuant to this advertisement, will be awarded to the lowest responsible bidder and on a non-discriminatory basis. The lowest responsible bidder must have an active Equal Employment Opportunity (EEO) Certificate of Compliance from the City of Urbana before the contract can be awarded. Applications for EEO Certificate of Compliance are reviewed only once per month by the City of Urbana; therefore, all bidders are encouraged to apply for EEO certification in advance of the bid opening. All bidders are hereby notified that any proposal requiring work to be performed by a contractor requires the prime and subcontractors to participate in an approved training program. All bidders must complete BLR 12325 and return with the bidders' proposals. If BLR 12325 is not completed, the bid will not be read. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents