Similar Projects
Bridge over Norfolk Southern
New Construction, Infrastructure
Conception
$5,013,000 CJ est. value
Hammond, IN 46324

Bridge over Norfolk Southern
New Construction, Infrastructure
Conception
$5,013,000 CJ est. value
Hammond, IN 46324

Tailor Row
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Hammond, IN 46320

Subdivision - Goodwill Store
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Crown Point, IN 46307

Intersection Improvement With Added Turn Lanes
Infrastructure
Bidding
$3,454,791 CJ est. value
Gary, IN 46403

Intersection Improvement With Added Turn Lanes
Infrastructure
Bidding
$3,454,791 CJ est. value
Gary, IN 46403

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Concrete Pavement Restoration
Infrastructure
Post-Bid
IN

Saint John Community Crossing`s Road Improvements
Results
Saint John, IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

New Administration Center, Alternative Education and Resource Center and Related Work
New Construction, Infrastructure
Construction
$19,869,043 CJ est. value
Crown Point, IN 46307

2022 CCMG Street Improvement Project
Infrastructure
Construction
$1,533,684 CJ est. value
Highland, IN 46322

St. John Commons
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Dyer, IN 46311

Rise and Shine Car Wash - Crown Point
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Crown Point, IN 46307

Savannah Cove Subdivision
New Construction, Infrastructure
Conception
$27,000,000 CJ est. value
Merrillville, IN 46410

Last Updated 04/21/2023 03:09 PM
Project Title

2022 City Wide Street Resurfacing

Physical Address View project details and contacts
City, State (County) Gary, IN 46402   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate - 08/16/22
Owner View project details and contacts
Architect View project details and contacts
Description

2022 City Wide Street Resurfacing Each bid must be accompanied by a Bid Bond or Certified Check, for not less than ten percent (10%) of the total amount of the bid. Any bid may be withdrawn prior to the scheduled time of the opening of bids or authorized postponement thereof. However, no bid may be withdrawn for sixty days after the scheduled time for opening, unless agreed to by the City of Gary. The City of Gary will make the award of the contract. In determining who the lowest responsive and responsible Bidder is, the City of Gary will consider the bid and all other relevant facts or matters mentioned in the Contract Documents which the City of Gary may legally consider in determining the lowest responsive and responsible bidder. The City of Gary reserves the right to reject any or all bids. Without limiting the generality of the foregoing, any bid which is incomplete, obscure, conditional, not on the prescribed form, has erasures or corrections in prices, includes additions or deductions not called for or is not accompanied by the required bid security and supporting documents and information may be rejected. However, the City of Gary reserves the right to waive any informalities or minor defects on the basis of the city's best interests. The City of Gary may make any investigation deemed necessary to determine the ability of a bidder to perform the work. Bidders shall furnish any information and data requested by the City of Gary to facilitate such investigations. The City of Gary reserves the right to reject any bid if the evidence submitted by, or investigation of, a bidder fails to satisfy the City of Gary as to the bidder's qualification to carry out the contract obligations. The City of Gary will take notice of any prior dealings between Bidder and City of Gary, and will rely on said prior dealings in determining if a Bidder is the lowest responsive and responsible bidder.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents