Similar Projects
Last Updated | 04/01/2021 10:27 AM |
Project Title | Phase 2 Water Main Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Bridgton, ME (Cumberland County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of constructing replacement of portions of the water main piping, services and appurtenances on Gage Street, Fowler Street, Walker Street, Cottage Street, Church Street, Nulty Street, and Route 302 (Portland Road) in Bridgton, Maine. This project shall consist of furnishing and installation of new water main pipe replacement for the street locations noted above. The project consists of approximately 600 l.f. of 12” dia. water main, 2,620 l.f. of 8” dia. water main, and 1,450 l.f. of 6” dia. water main within the street segments indicated above. The project will include 4 new hydrant assemblies, new resilient wedge gate valves, fittings, water services, live tapping valve installation, trench pavement for disturbed areas from the project, and loam and seed for all non-pavement/gravel disturbed areas. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |