Similar Projects
Mechanical Construction Multiple Award Indefinite Delivery Indefinite Quantity (IDIQ) Contract
Design
$2,500 to $1,500,000 est. value
Gaithersburg, MD 20899

Time and Material Boiler Prevention Maintenance Services
Post-Bid
Largo, MD 20774

J--Inspections and Preventive Maintenance on the CO Gas Detection System, Model# CO-CEL-36-120 Located at the P1 Parking Garage of the Baltimore VA Medical Center
Post-Bid
Baltimore, MD

J--NCC York Chiller Maintenance Contract Base + 4OY
Results
Baltimore, MD 21235

Maintenance and Repair to Three (3) Boilers at Patuxent Institution
Results
Jessup, MD 20794

J--Perform Boiler Safety Device Testing and Maintenance
Post-Bid
Perry Point, MD 21902

Maintenance and Repair for Mechanical Cooling Boilers Automatic Temperature Control Systems and Refrigeration Equipment
Term Contract
Results
Less than $60,898 est. value
Bel Air, MD 21015

Project X Wing 2 Tier III - Electric
Post-Bid
Germantown, MD

On-Call Repair, Critical Electrical and Mechanical Services for Water and Wastewater Treatment Systems
Results
Bowie, MD 20716

CUP Project
Term Contract
Post-Bid
Bethesda, MD

Boiler Replacement at Elmwood Elementary School
Results
Baltimore, MD 21206

Overhead Door/Fire Doors/Dock Levelers Maintenance And Replacement
Post-Bid
Laurel, MD 20707

Boiler and Water Heater Replacement - Chase Elementary School
Results
Middle River, MD 21220

MPCTC Boiler Breaching Repair
Post-Bid
Sykesville, MD 21784

Magnetic Bearing Chiller Preventative Maintenance and On-Call Services
Results
Bel Air, MD 21014

Last Updated 04/15/2020 04:45 PM
Project Title

Boiler Replacements

Physical Address View project details and contacts
City, State (County) Salisbury, MD 21804   (Wicomico County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install replacements for two (2) existing natural gas/fuel oil hydronic boilers and associated pumps which serve the heating load for the Hazel Center (HC). Most of the heat load was taken off these original boilers in 2016 after the installation of a geothermal system in Brunkhorst Hall (BH) and Maner Technology Center (MTC). The boilers are now oversized for HC. The proposed replacements will be smaller and more efficient.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents