Similar Projects
Project Luna / 1111 Akron Way
New Construction, Infrastructure
Design
$33,000,000 CJ est. value
Forney, TX 75126

Lions Den Self Storage Phase 2
New Construction, Infrastructure - 23,200 SF
Design
$696,000 CJ est. value
Kaufman, TX 75142

Grading Improvements for Eastland, Phase 3B
Infrastructure
Bidding
$1,958,000 CJ est. value
Kaufman, TX 75142

Road Repair/Asphalt Overlay for Pct. 4 Road and Bridge
Infrastructure
Bidding
$200,000 CJ est. value
Kaufman, TX 75142

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Grading Improvements for Eastland, Phases 1B and 1C
Infrastructure
Post-Bid
TX

Windmill Farms Walden Pond Water Line Extension
Results
TX

Utility Improvements for Briarwood Hills, Phase 2
Infrastructure
Results
TX

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

Business Park / Forney
New Construction, Infrastructure - 1,100,000 SF
Pending Verification
$46,000,000 CJ est. value
Forney, TX 75126

Crossroads at Terrell Phase 2
New Construction, Infrastructure - 366,577 SF
Design
$43,885,000 CJ est. value
Terrell, TX 75160

Windmill Farms Walden Pond Water Line Extension
Infrastructure
Post-Bid
Forney, TX 75126

Utility Relocations for the US80 and SH205 Roadway Improvements
Infrastructure
Results
$1,600,000 to $1,800,000 est. value
Terrell, TX 75161

Project Owl / Building 1
New Construction, Infrastructure - 817,400 SF
Pending Verification
$32,000,000 CJ est. value
Forney, TX 75126

Lux at Gateway
New Construction, Infrastructure - 282,736 SF
Design
$40,000,000 CJ est. value
Forney, TX 75126

Last Updated 11/01/2022 03:05 PM
Project Title

Paving Improvements for Windmill Farms Phase 6B

Physical Address View project details and contacts
City, State (County) Forney, TX 75126   (Kaufman County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,848,218 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project No. 6483-00 For the furnishing of all material, equipment, labor and supervision necessary or incidental to "Construction of UtilityImprovements for Windmill Farms 6B, Forney Texas ETJ, Kaufman County, Texas." 1. Approximately 10,000 LF of 8-inch water line and all appurtenances 2. Approximately 8,700 LF of 8-inch sanitary sewer and all appurtenances 3. Approximately 6,700 LF of 18-inch RCP through 7'x4' RCBC storm sewer pipe and appurtenances There will be NO PRE-BID CONFERENCE. Given the state of emergency due to COVID-19, the Federal guidelines of not gathering in groups of more than 10 people, people who want to attend the bid opening must do so byMicrosoft TEAMS.Microsoft TEAMS is free downloadable application for computer and cellular devices. A calendar invite will be sent to all plan holders listed on CivCast.com for access to the bid opening. There are two options to participate: 1. For those of you who wish to view the opening, the calendar invite will contain a link to join the TEAMS meeting. With this link you can see the opening online If you do not receive the calendar invite because you are not a formal plan holder on CivCast, please emaillbell@bgeinc.com and the invite will be forwarded to you no later than 2 hours before the bid opening Each Bid must be accompanied by a bid bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided and provide the required insurance certificates within 7 days after the date Contract Documents are received by the Contractor The deadline to ask questions is 10/28/2022 12:00 PM CDT The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. These changes should be in Addendum form: Paving Improvements for Windmill Farms Phase 6B, Forney, Texas ETJ This project has had the following changes: Scope has changed from 1. Approximately 10,000 LF of 8-inch water line and all appurtenances 2. Approximately 8,700 LF of 8-inch sanitary sewer and all appurtenances 3. Approximately 6,700 LF of 18-inch RCP through 7'x4' RCBC storm sewer pipe and appurtenances to 1. Approximately 36,000 SY of 6-inch subgrade preparation 2. Approximately 34,400 SY of 6-inch reinforced concrete pavement 3. Restoration of the site 21-24906

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents