Similar Projects
EP-177 Washington Road Sidewalks
Bidding
East Point, GA

Parking Lot Upgrade Services
Bidding
$200,000 est. value
Atlanta, GA

Lester Road Pedestrian Improvements
Post-Bid
Union City, GA 30291

Brady Mobility Facility Parking Lot Restriping
Post-Bid
Atlanta, GA

Sandy Springs Circle Streetscapes
Results
Sandy Springs, GA

TS137 Johnson Ferry at Glenridge Connector SidePath
Results
Sandy Springs, GA

1200 Lake Hearn Medical Office Building Parking Lot Improvements
Renovation
Construction
Sandy Springs, GA

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Hapeville CDBG Park Improvements
New Construction
Bidding
Hapeville, GA 30354

Buckhead CID West Village Streetscape Project
Post-Bid
Atlanta, GA 30301

EP-207 West Taylor Avenue Sidewalks Phase 1
Results
East Point, GA

Stadium Red Lot Bus Only Lane
Bidding
Atlanta, GA 30315

Creek Walk Connector Trail
New Construction
Post-Bid
GA 30324

Wyatt and Brady Center Parking Lot Improvement
Results
College Park, GA 30337

Providence Park Improvements
New Construction - 635 SF
Bidding
Milton, GA 30009

Last Updated 07/10/2020 09:38 AM
Project Title

Eastside Trail Capital Improvements Construction

Physical Address View project details and contacts
City, State (County) Atlanta, GA   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of several capital improvements to the existing Eastside Trail running from the intersection of 10th Street and Monroe Drive to the intersection of the trail and Irwin Street, Atlanta.The Eastside Trail opened in 2013 and spans two miles from the intersection of 10th Street and Monroe Drive to Irwin Street in Atlanta, Georgia. Design and construction of the trail segment was funded by a combination of public and private philanthropic sources. More than two million users per year visit the 14-foot wide multi-use trail, which connects Inman Park, Historic Fourth Ward, and Atlanta’s Midtown neighborhoods. Due to the high volumes of users over the past six years, the trail and its surroundings need improvements to the stormwater conveyance system as well as additions to the hardscape and landscape. A large portion of these improvements will be to the current 2-foot soft shoulder that parallels most of the trail. To provide additional space for users and to help prevent further undermining of the trail surface, Flexi-Pave has been specified for installation along both sides of the trail to help mitigate both user volume and stormwater issues. Installation of a new piped conveyance drainage system at Drewry Street will require trail closures and detours.

Details

Site Development.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents