Similar Projects
Houlton Superior Court Building - First Floor HVAC Renovations
Renovation
Sub-Bidding
$200,000 CJ est. value
Houlton, ME 04730

Heat Pump Replacement Project
Renovation
Sub-Bidding
$475,000 CJ est. value
Biddeford, ME 04005

HVAC Contract Services
Alteration
Post-Bid
Brunswick, ME

Chiller Replacement for Riverview Psychiatric Center
Alteration
Post-Bid
$700,000 est. value
Augusta, ME 04330

Vent Duct
Results
Kittery, ME 03904

Franklin Deficiency List Repairs
Term Contract
Results
$100,000 to $250,000 est. value
Franklin, ME 04634

Air Handler Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Augusta, ME 04330

NMCC Christie HVAC Renovation
Alteration
Post-Bid
$650,000 to $750,000 est. value
Presque Isle, ME 04769

Holden Elementary School Indoor Air Quality Improvements Project
Alteration
Results
Holden, ME 04429

Science Wing Hvac Upgrades Bangor High School
Renovation
Sub-Bidding
$700,000 CJ est. value
Bangor, ME 04401

Vine Street School - Heating System Project
Alteration
Post-Bid
Bangor, ME 04401

Repairs on The 2nd Floor Classrooms HVAC Fan Coil Units in Auburn, ME
Term Contract
Results
Auburn, ME 04210

Installation of Heat Pump Systems
Alteration
Post-Bid
Portland, ME

UM DP Corbett HVAC Renovation
Alteration
Results
Orono, ME

Heat Pump with Installation
Alteration
Post-Bid
Alexander, ME

Last Updated 02/22/2023 10:35 AM
Project Title

HVAC Improvements - Androscoggin County Courthouse and Jail Facilities Project

Physical Address View project details and contacts
City, State (County) Auburn, ME 04210   (Androscoggin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Project consists of: 1. Scope: The Work consists of demolition and replacement for the existing central steam boilers with revisions to the central plant as required to de-couple steam service to the Courthouse, dedicating the steam boilers to the Jail facility; new natural gas fired storage type water heaters for the jail facility; new condensing gas fired boilers to serve the Androscoggin County Courthouse; new heating, ventilation, and air conditioning systems throughout the Androscoggin County Courthouse; new indirect domestic water heaters for the Courthouse facility; replacement for the energy recovery wheels at the Jail; and enhancements to the exhaust ventilation system serving the first floor holding cells at the Jail, including all related architectural, structural, and electrical work required to facilitate te mechanical improvements, as described in the Contract Documents. Bid security shall be submitted with each bid in the amount of 5 (Five) percent of the bid amount. No bids may be withdrawn for a period of 30 thirty days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Tim. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance required for the Work as specified in AIA Document A101-2017 Exhibit A The Androscoggin County Commissioners reserve the right to accept or reject any and all bids and, at their discretion, to wave all formalities Per owner, all bids were rejected this will re-bid at a future time and date TBD.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents