Similar Projects
Building 28 Canopy and Slab - Stoneville
Alteration
Design
$25,000 to $100,000 est. value
Leland, MS 38756

Alcorn County Box Culvert and Approaches to Replace Bridge 151
New Construction, Infrastructure
Bidding
$270,000 est. value
MS

Lafayette County Firing Range Observation Tower and Pavilion
Infrastructure
Bidding
$500,000 est. value
MS

Dollar General #24582 / Batesville
New Construction, Infrastructure - 10,640 SF
Sub-Bidding
$2,000,000 CJ est. value
Batesville, MS 38606

Erosion Repairs at CR 8541
Post-Bid
MS 38829

Emergency Watershed Protection
Post-Bid
MS

Slide Repair
Results
MS

Bank Stabilization on US 84 at the Fair River (Bridge Nos. 74.9A and 74.9B)
Results
MS

Saltillo Sportsplex Drainage
Infrastructure
Bidding
$200,000 est. value
Saltillo, MS 38866

Emergency Watershed Protection Program - 2020
Post-Bid
Hernando, MS

Weymouth Hall EWP Project - City of Natchez
Results
$150,098 est. value
Natchez, MS 39120

Sanitary and Storm Sewer Rehabilitation Annual Contract
Infrastructure
Bidding
$420,000 CJ est. value
Meridian, MS 39301

HDPE Corrugated Plastic Pipe
Term Contract
Post-Bid
MS

Loyd Star Attendance Center Drainage and Grading Improvements
Results
$125,160 est. value
Wesson, MS 39191

Concrete Pipe
Infrastructure
Bidding
Meridian, MS

Last Updated 07/21/2022 02:34 PM
Project Title

Install Geomembrane Liner at ASP Camp Shelby Joint Forces Training Center

Physical Address View project details and contacts
City, State (County) Camp Shelby, MS 39401   (Forrest County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Adjutant General reserves the right to reject any and/or all bids and to waive informalities. Award of contract is subject to availability of funds. Bids will be held open for 60 days from bid date. Each bid must be accompanied by 5% of bid bond. Performance bond and payment bond in an amount equal to 100% placement of a geomembrane material over five (5) existing ammo storage bunkers and three (3) existing field storage areas located on the project site and provide a french drain system around the perimeter of each bunker to remove runoff. PART II - DESCRIPTION OF BID ITEMS: 2.01 Base Bid: Base bid includes approximately 24,200 square feet of geomembrane for overlay on five (5) existing ammo storage bunkers, approximately 3,880 square feet of French drain which includes approximately 1,136 linear feet of perforated sock pipe and washed gravel. 2.02 Additive Alternate No. 1: Base bid includes approximately 74,400 square feet of geomembrane for overlay on three (3) existing field storage areas, approximately 7,050 square feet of French drain which includes approximately 2,170 linear feet of perforated sock pipe and washed gravel

Details

Division 02 - Existing Conditions, Common Work Results for Existing Conditions, Geosynthetics for Existing Conditions, Geomembranes for Existing Conditions.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents