Similar Projects
RFQ Design - Architectural/Engineering Services for Public Works Office and Shops Building Project
New Construction, Demolition, Infrastructure
Conception
Spokane, WA

I-90/Lindeke St Crossing - Bridge Deck Repair
Infrastructure, Renovation
Conception
$689,000 CJ est. value
Spokane, WA 99201

Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Design
$10,000,000 CJ est. value
Spokane Valley, WA 99206

Koz on West 4th Avenue
New Construction, Infrastructure - 172,000 SF
Design
$98,800,000 CJ est. value
Spokane, WA 99204

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Spokane International Airport Concourse C Trex Bid Package 14 - Resilient, Tile and Carpet (Re-bid)
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$145,000 CJ est. value
Spokane, WA 99224

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Bigelow Gulch Road Project Six
Alteration
Post-Bid
Spokane, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Doris Morrison Learning Center Building Site and Trail
Renovation, Infrastructure - 6,000 SF
Results
WA

South Hayford Road Warehouse - Project Gray
New Construction, Infrastructure - 278,100 SF
Pending Verification
$30,000,000 CJ est. value
Spokane, WA 99224

South Hayford Road Warehouse - Project Gray
New Construction, Infrastructure - 278,100 SF
Pending Verification
$30,000,000 CJ est. value
Spokane, WA 99224

Spokane Treatment and Recovery Nora House
New Construction, Infrastructure - 44,000 SF
Conception
$25,600,000 CJ est. value
Spokane Valley, WA 99216

Upriver Dam Spillway Rehabilitation Phase III-Rebid
Infrastructure
Design
$1,337,538 CJ est. value
Spokane, WA 99201

Last Updated 09/26/2022 12:02 AM
Project Title

Havana Well Station - Phase 1

Physical Address View project details and contacts
City, State (County) Spokane, WA 99201   (Spokane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2022
Bids Due View project details and contacts
Estimated Value $5,711,636 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of one approximately 40’ x 80’ CMU buildings to house 3 vertical turbine pumps and motors, as well as the associated electrical and mechanical appurtenances to support the function of the well stations. Site improvements will include connections to existing water transmission mains, grading, paving, and landscaping. This project will take place within the City of Spokane Valley. This a rebid of a scaled down version of the same project bid in June of this year. The City of Spokane, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulation, Department of Transportation, subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin, or sex in consideration for an award. Range: $4,000,000.00 - $4,500,000.00 Bids shall be submitted on the forms provided in accordance with the provisions of the Specifications. Irregular bid proposals will be rejected in accordance with the specifications. Cashier’s check, a certified check or surety bond in the sum of five percent (5%) of the Total Project Bid must accompany the copy of the bid filed with the City Clerk. Successful bidder shall execute the Contract within TEN (10) calendar days after receiving the Contract. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated herein, the bid proposal deposit shall be forfeited to the City of Spokane. The City of Spokane will normally award this Contract or reject bids within FORTY FIVE (45) calendar days after the time set for the bid opening. If the lowest responsible Bidder and the City of Spokane agree, this deadline may be extended. If they cannot agree on an extension by the 45-calendar day deadline, the City of Spokane reserves the right to Award the Contract to the next lowest responsible Bidder or reject all Bids.

Details

Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents