Similar Projects
Defoamant - Kaw Point Treatment Plant
New Construction
Results
Kansas City, KS

Operation and Maintenance for Oakland RNG Pipeline
Renovation
Post-Bid
Topeka, KS

Wastewater Treatment Plant Aeration Blower Replacement
Renovation
Results
Wamego, KS

Odor and Corrosion Control Services
New Construction
Post-Bid
Wichita, KS

Wastewater Treatment Plant Aeration Improvements
Renovation
Bidding
$400,000 est. value
Garden City, KS 67846

2022 Wastewater Treatment Facility Improvements
Renovation
Results
$2,601,500 est. value
Osawatomie, KS 66064

Wastewater Treatment Plant Improvement Project Packages
Renovation
Post-Bid
$30,000,000 est. value
Salina, KS 67401

Construction Manager At Risk - Project Approach
Renovation
Post-Bid
$1,625,000 est. value
Topeka, KS

Turkey Creek WWTF Miscellaneous Improvements
Renovation
Results
Mission, KS 66202

SCADA System Maintenance and Integration Services
Term Contract
Post-Bid
Overland Park, KS 66224

Wastewater Treatment Plant Aeration Improvements
Renovation
Bidding
$400,000 est. value
Garden City, KS

On Call Contractor Services for Treatment Plant
Term Contract
Post-Bid
Wichita, KS

Water Treatment West Plant Basin Rehabilitation
Renovation
Results
Topeka, KS 66606

Wastewater Treatment Plant SCADA Controls & Instrumentation Maintenance NBAF
Renovation
Post-Bid
Manhattan, KS 66506

Last Updated 07/08/2022 08:15 AM
Project Title

Compact Low Speed Mixer Water Pollution Control

Physical Address View project details and contacts
City, State (County) Topeka, KS 66616   (Shawnee County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City is soliciting bids to replace the existing Flygt 4660 compact low speed mixer as specified below to support operations of the Water Pollution Control Division of Utilities. Equipment that meets or exceeds performance and specifications of the existing mixer as described and shown herein.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents