Similar Projects
New Water Treatment Facility
New Construction
Conception
Burlington, NJ

Aeration System for Culver Lake
Demolition
Bidding
$790,000 est. value
Branchville, NJ 07826

Provide a Service to Properly Maintain the Various Cooling Water Facilities at the Newark Bay Treatment Plant
Term Contract
Post-Bid
Newark, NJ 07105

Perform Copper Sulfate Treatments for Algae Control
Post-Bid
Newark, NJ

Replacement of Reverse Osmosis (RO) Membrane Elements
Results
Keansburg, NJ

Influent Screening Facility
Results
Budd Lake, NJ 07828

2019 Reconstruction of Facilities at the Ship Bottom Water Treatment Plant
Construction
Ship Bottom, NJ 08008

Water Treatment Plant Upgrade, Chemical Building Expansion - Phase 2
Construction
Florence, NJ 08518

Providing Excavation and Repair Services
Term Contract
Post-Bid
Elizabeth, NJ 07202

Furnishing and Delivery of Center Flow Screening Systems
Results
Cape May Court House, NJ 08210

Carl J. Olsen Treatment Plant - Upgrades and New Ozone Treatment Facility
New Construction, Renovation
Construction
Edison, NJ 08817

WYE Replacement on Effluent Pipe Wastewater Treatment Plant
Post-Bid
Burlington, NJ 08016

Corrosion Control Treatment System-Phase II
Results
Trenton, NJ 08608

Well No 25 Water Treatment Plant
Construction
$9,420,000 est. value
Monroe Township, NJ 08831

Furnish and Deliver Settling Tank Parts and Materials
Post-Bid
Belmar, NJ 07719

Last Updated 10/27/2021 03:13 PM
Project Title

Jackson Mills Road Water Treatment Plant South Side Filter Upgrades

Physical Address View project details and contacts
City, State (County) Asbury Park, NJ   (Monmouth County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the furnishing of all labor, materials and equipment necessary to complete the work as described in the Specifications. The work consists of project mobilization; removal and disposal of existing Greensand filter media; removal and reinstallation of the existing inlet distribution; removal and replacement of air distribution systems; inspection of the filter by manufacturer's representative, Contractor and Engineer; removal and replacement of existing sand valves; internal and external welding and repairs to filter internals (if and where directed); installation of GreensandPlus filter media; disinfection, testing and flushing of filters; start-up of repaired units; site clean-up and demobilization.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents