Similar Projects
Last Updated | 08/22/2022 11:33 AM |
Project Title | Michigan Drive Lift Station Improvements MEC211201 |
Physical Address | View project details and contacts |
City, State (County) | Evansdale, IA 50707 (Black Hawk County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Bids by Invitation |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $594,000 [brand] Estimate |
Plans Available from | Civil Engineer - 06/22/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project includes all materials, equipment, transportation, and labor needed to complete the improvements as follows: 1. Removal and demolition of existing sanitary lift station equipment including pumps, piping, electrical equipment, conduit, and all other existing items called to be removed in the Drawings. 2. Demolition of existing package lift station dry well and existing wet well cover. 3. rehabilitation of an existing wet well including new grout floor and fillets, coating of the wet well interior, raising and installation of new wet well cover. 4. Installation of new pumps, discharge piping, guide rails and other appurtenances. 5. installation of new valve vault structure, associated piping and valves. 6. Installation of new electrical systems, duplex lift station controls, standby power system, associated conduits and wiring. 7. Associated site utility work and underground piping. 8. All bypass pumping and traffic control required for the completion of the project. 9. All other work required by the Contract Documents. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |