Similar Projects
RWCC Water Storage Tank Replacement
Term Contract
Design

Annual Aboveground Storage Tank (AST) Inspections
Term Contract
Design
Baltimore, Perry Point, MD 21201

Water Storage Tower Painting and Repair
Infrastructure
Bidding
MD

Water Tower Improvements (Bulle Rock)
Infrastructure
Bidding
Havre de Grace, MD

Design Build Water Tower Repairs
Post-Bid
Germantown, MD 20874

Operational Superintendent for the Water and Wastewater Treatment Plants
Renovation, Term Contract
Post-Bid
Beltsville, MD 20705

Cliffton Water System Improvements - Elevated Storage Tank
Results
Newburg, MD 20664

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Germantown Water Tower
Term Contract
Post-Bid
Germantown, MD 20874

Ballast Tank Preservation
Results
Baltimore, MD

Contractor Design-Build (DB) Services and Recertification of Water Tower
Term Contract
Post-Bid
Germantown, MD 20874

World-Wide Water Storage Tank Remediation
Term Contract
Results

Cistern Troubleshooting and Repairs - Evergreen Elementary School
Alteration
Post-Bid
California, MD 20619

Co2 Bulk Tank Replacement
Results
Frederick, MD

Tank Inspection
Term Contract
Post-Bid
Andrews Air Force Base, MD

Last Updated 02/22/2022 08:18 AM
Project Title

Bonnie Brook Water Facilities Upgrade

Physical Address View project details and contacts
City, State (County) Cambridge, MD   (Dorchester County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the construction of a new water facility for the Bonnie Brook community in the vicinity of Cambridge, Maryland. Work includes the construction of two (2) 10,000-gallon hydro-pneumatic ground storage water tanks enclosed in an approximately 1,700 square foot water facilities building. Additional work includes a chlorine chemical system, control room, yard and process piping, site work, electrical and mechanical components, control systems, and other incidental work. Work will also include the demolish of the existing 20,000-gallon hydro-pneumatic tank and masonry building.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents