Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Raubsville Road over Frey's Run
Demolition, New Construction, Infrastructure
Design
$1,922,385 CJ est. value
Williams Township, PA 18042

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

Indian Trail Road over Hokendauqua Creek
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Northampton, PA 18067

SR 329 - Cementon Bridge
Demolition, New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Northampton, PA 18067

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Rebid - Colonial Bathroom Replacement at the Louise Moore Park
Demolition, New Construction, Infrastructure
Post-Bid
$80,000 CJ est. value
Easton, PA 18045

2021 CDBG Project - South Lincoln Avenue Water Main Replacement Project
Infrastructure
Results
$277,110 est. value
Walnutport, PA 18088

Bushkill Waterline Installation Project
Infrastructure
Results
Easton, PA

2022 36 Minsi Trail Siphon South Access Improvements
Infrastructure
Construction
$77,400 CJ est. value
Bethlehem, PA 18018

East 3rd Street Mixed-Use Development
Demolition, New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Bethlehem, PA 18015

Lehigh Valley Trade Center III
New Construction, Infrastructure - 540,000,000 SF
Pending Verification
$45,000,000 CJ est. value
Bethlehem, PA 18020

Banana Factory Arts & Education Center / Bethlehem
Demolition, New Construction, Infrastructure - 73,485 SF
Pending Verification
$22,000,000 CJ est. value
Bethlehem, PA 18015

SR 512 Adaptive Signal Upgrade
Infrastructure
Conception
$2,946,390 CJ est. value
Wind Gap, PA 18091

Reported 01/11/2023 12:00 AM
Project Title

Bushkill Pump Station Upgrade

Physical Address View project details and contacts
City, State (County) Easton, PA 18042   (Northampton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project cancelled as of 12/13/22, A timeline for rebid has not been established. The project consists of replacing the existing Bushkill Pumping Station. The project includes the installation of a new doghouse manhole, a new wet well with a submersible grinder and submersible pumps, a new valve building, a new backup generator, a new discharge force main, and associated controls and appurtenances. The City of Easton hereby reserves the right, which is understood and agreed to by all bidders, to refuse any or all bids submitted; and also reserves the right to waive any informality in bids received, but any contract awarded will be to the lowest responsive, responsible bidder. CLARIFICATION DEADLINE 1/4/2023 5:00 PM The Pennsylvania Prevailing Wage Act applies to the Project. The successful Bidder shall be required to comply with the Act, and pay wages in accordance with the PA Department of Labor and Industry Prevailing Wage Determination. The Pennsylvania Public Works Employment Verification Act (Act 127 of 2012) also applies to the project. In accordance with the Public Works Employment Verification Act 127, all contractors and subcontractors, as a precondition to receiving a contract on Public Works Projects (defined under the Prevailing Wage Act), are to fully comply with the Act through utilization of the Federal E-Verify Program (EVP) operated by the United States Department of Homeland Security. A fully executed copy of a PUBLIC WORKS EMPLOYMENT VERIFICATION FORM shall be submitted to the Engineer with the contract documents at the time of contract signing. With each pay request, the Contractor shall submit a statement that states they have fully complied with Act 127 with regard to any new employees. Bidders on this work will be required to comply with the Pennsylvania Human Relations Act No. 222. The requirements for Bidders and Contractors under these enactments are explained in the Specifications. Except as otherwise provided by law, no Bidder may withdraw his bid within sixty (60) consecutive calendar days after the actual date of opening thereof, or one hundred twenty (120) consecutive calendar days if the award is delayed by a required approval of another governmental agency, the sale of bonds or the award of a grant or grants.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents