Similar Projects
Pedricktown Disposal Area Complex
Design
$5,000,000 to $10,000,000 est. value
Pedricktown, NJ

Mystic Island Drainage Improvements Phase 2
Infrastructure
Bidding
Mystic Island, NJ 08087

Rebuild By Design Hudson River Coastal Defense - Resist Alignment
Infrastructure
Bidding
$196,000,000 est. value
Hoboken, NJ

Kresson Road (CR 671) Roadway and Drainage Improvements from Brace Road (NJSH 154) to Howard Johnson Road
Post-Bid
Cherry Hill, NJ

Teaneck Creek Restoration at Overpeck County Park
Post-Bid
Teaneck, NJ 07666

Culvert Wall Restoration on North Park Drive in the Township of Cherry Hill
Results
Cherry Hill, NJ

Port Monmouth, Phase 2, Contract 4A
Results
$2,000,000 to $3,000,000 est. value
Port Monmouth, NJ 07718

Humphreys Avenue Bulkhead Reconstruction
Infrastructure
Bidding
Pennsville, NJ 08070

Furnish Drainage Cleaning on Essex County Roadways
Term Contract
Post-Bid
Newark, NJ 07102

Lake Riviera- Rainbow Dam Culvert Replacement and Embankment Restoration
Results
$177,820 est. value
Brick, NJ 08723

2021 Miscellaneous Drainage Improvements
Infrastructure
Bidding
Newark, NJ

2020 Citywide Drainage Improvements
Post-Bid
Vineland, NJ 08360

Construction of Perimeter Floodwall
Results
$225,900 est. value
Newark, NJ 07105

Veteran's Park Drainage Improvements
Infrastructure
Bidding
Trenton, NJ 08648

Police Department Parking Lot Drainage Improvements
Post-Bid
Bayville, NJ 08721

Reported 06/25/2021 12:00 AM
Project Title

Beach Nourishment Cape May Inlet to Lower Township Cape May County, Cape May, New Jersey

Physical Address View project details and contacts
City, State (County) Cape May, NJ   (Cape May County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $30,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located on the Atlantic coast of New Jersey, extending from the Cape May Inlet southwest jetty to the 3rd Ave terminal groin in Cape May City. It includes the communities of the City of Cape May and Lower Township, and the US Coast Guard Training Center. The contract work will consist of a base bid to conduct pre-placement condition surveys and place/ pump approximately 491,000 cubic yards of sand from a borrow area approximately 2.6 miles south of the Cape May Inlet jetties onto the beach at 2 locations: Area 1, the U.S. Coast Guard Training Center (approx 450,000 CY) and Area 2, Wilmington Avenue (approx 41,000 CY). Options to place additional sand from the same borrow area to achieve the full project design template at these same two beach locations will be included. The options will be as follows: 1 option for 100,000 CY (Area 1), 3 options for 50,000 CY each (Area 1) and 1 option for 10,000 CY (Area 2). Sand must come from the offshore borrow area. Trucking in sand will not be permitted under this contract. All work under the contract must be completed no later than March 1, 2022

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents