Similar Projects
FY 2021/22 Sewer Lining Project
Infrastructure
Bidding
$1,375,000 CJ est. value
Huntington Beach, CA 92648

Urgent Plumbing Services
Term Contract
Post-Bid
Santa Ana, CA 92701

Plumbing Maintenance Services
Term Contract
Post-Bid
Tustin, CA

Water Bottle Filling Station Replacements
Alteration
Results
$215,000 est. value
Santa Ana, CA

FY22-23 Manhole and Valve Box Adjustment
Infrastructure
Results
$591,250 CJ est. value
Yorba Linda, CA 92886

RFQ Contractor - Job Order Contract (JOC) for Plumbing Services
Term Contract
Post-Bid
Santa Ana, CA 92701

Digester #2 Structural and Mechanical Rehabilitation
Renovation
Results
$922,325 CJ est. value
San Clemente, CA 92672

Newport Beach Pump Stations Pressurization Improvements
Renovation, Infrastructure
Post-Bid
$1,412,000 CJ est. value
Santa Ana, CA 92708

Liquid Oxygen Tank A Replacement at Plant No. 2
Renovation, Infrastructure
Results
$3,300,000 CJ est. value
Huntington Beach, CA 92646

Tracks at Brea Western Extension Community Outreach and Concept Design
Infrastructure
Post-Bid
$200,000 CJ est. value
Brea, CA 92821

JRWSS Crown Valley Parkway Transmission Main Relocation
Infrastructure
Results
$3,884,665 CJ est. value
Laguna Beach, CA 92677

Citywide Plumbing Services
Term Contract
Post-Bid
$75,000 CJ est. value
Laguna Beach, CA 92677

Annual Sewer Replacement Maintenance FY 2022-2023
Infrastructure
Results
$2,744,450 CJ est. value
Orange, CA 92866

On-Call Plumbing Services
Term Contract
Post-Bid
Newport Beach, CA 92663

Placement of Cured-In-Place Pipe (CIPP) and Manhole Rehabilitation
Infrastructure
Post-Bid
$300,000 CJ est. value
Brea, CA 92821

Last Updated 06/21/2023 09:14 AM
Project Title

Michelson Water Recycling Plant Tertiary Filter Improvements

Physical Address View project details and contacts
City, State (County) Irvine, CA 92612   (Orange County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $18,100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project will replace and rehabilitate mechanical, electrical, and instrumentation components at the Michelson Water Recycling Plant Tertiary Filters Tanks Area, Air Scour Blowers Area, and Backwash Supply Tank Area. At the Tertiary Filters Tanks Area, a new platform will be installed for a new PLC cabinet, and the electrical and mechanical components will be replaced, including but not limited to valves, actuators, slide gates, compressed air system, conduits, and instruments. At the Air Scour Blowers Area, the blowers will be replaced, and all mechanical, electrical, and instrumentation components will be replaced. At the Backwash Supply Tank Area, a new CMU electrical building will be installed, the concrete at the backwash supply tank will be rehabilitated, the backwash supply pumps will be replaced, and all mechanical, electrical, and instrumentation components will be replaced. Online Q&A Yes Q&A Deadline 03/21/2023 2:00 PM Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification to be placed on the Project Bidders List for this Project is closed. Liquidated Damages $2,000 per calendar day Estimated Bid Value $17,899,000.00 Start/Delivery Date Notice of Award Project Duration 900 calendar days from the date of the Notice of Award

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents