Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

Street Sweeping
Term Contract
Post-Bid
Lake Orion, MI

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

19.56 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Full Depth Concrete Pavement Repairs, Joint Repairs and Pavement Markings
Results

The Delaware
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Royal Oak, MI 48067

The Delaware
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Royal Oak, MI 48067

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

2021 Butler Road Rehabilitation Program
Results
Rochester Hills, MI 48306

Three (3) Boss Snow Plows
Infrastructure
Post-Bid
Rochester Hills, MI

2021 Pavement Reconstruction
Results
Lathrup Village, MI

FPE Cip Paving 2021
Infrastructure
Post-Bid
Waterford Township, MI 48328

Calumet-Swedetown Trail Capping, And Route Grading
Results

Last Updated 08/18/2022 02:04 PM
Project Title

2022 Asbestos Cement Watermain Replacement

Physical Address View project details and contacts
City, State (County) Novi, MI 48375   (Oakland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $6,532,828 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removing and abandoning existing asbestos cement watermain; installing new ductile iron watermain by open cut; installing water service connections; and removing and restoring roadways, landscaping, and other disturbed surfaces. General Requirements - Bid Deposit Required - Insurance Required Award Requirements - All or None Award Delivery Point Novi, MI Questions are submitted online No Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % - Maintenance & Guarantee Bond 100 %

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents