Similar Projects
Reported | 01/16/2019 12:00 AM |
Project Title | Bridge and Roadway Paving Contracts - 2019 -2021 |
Physical Address | View project details and contacts |
City, State (County) | Fort Lee, NJ (Bergen County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bridge and roadway paving contracts. This work may be performed at the following Port Authority Facilities: 1) Holland Tunnel 2) Staten Island Bridges 3) Lincoln Tunnel and Port Authority Bus Terminal 4) George Washington Bridge and George Washington Bridge Bus Station The work required to be performed includes, but is not limited to: 1. Provide labor, material and equipment to mill and pave asphalt and/or concrete pavements on grade, suspended concrete and steel deck. 2. Pave with heavy-duty paving mixes (i.e. Superpave) and asphalt additives such as Rosphalt. 3. Furnish and install waterproofing membranes 4. Furnish and install lane striping, markers and reflectors 5. Furnish, install and remove maintenance material and protection of traffic material. 6. Work within restricted work hours, including weekends 7. Follow staging requirements. 8. Maintain roadways fully operational during peak traffic periods. | ||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |