Similar Projects
32nd Street North East from Carlisle Street through Oakland Road Pavement Reconstruction
Conception
$2,000,000 est. value
Cedar Rapids, IA 52402

Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 est. value
Urbandale, IA 50322

29th Street Reconstruction (Jones Street to Cheyenne Boulevard)
Infrastructure
Design
$6,150,000 CJ est. value
Sioux City, IA 51104

29th Street Reconstruction (Jones Street to Cheyenne Boulevard)
Infrastructure
Design
$6,150,000 CJ est. value
Sioux City, IA 51104

2022 ADA Pedestrian Ramp Sidewalk Project
Infrastructure
Bidding
$25,000 CJ est. value
Charles City, IA 50616

2022 ADA Pedestrian Ramp Sidewalk Project
Infrastructure
Bidding
$25,000 CJ est. value
Charles City, IA 50616

Snow Hauling 2022-2023
Term Contract
Sub-Bidding
Davenport, IA 52801

Cedar Falls High School Natatorium
New Construction, Infrastructure - 37,000 SF
Sub-Bidding
$13,400,000 CJ est. value
Cedar Falls, IA 50613

Various Locations - HMA Resurfacing with Milling
Infrastructure
Post-Bid
IA

Hawkeye Wildlife Unit North Road and Babcock Access Road Maintenance
Infrastructure
Post-Bid
$190,000 est. value
Oxford, IA

East 2nd Street Reconstruction from East Court Avenue to Iowa Interstate Railroad
Infrastructure
Results
$1,177,500 est. value
Des Moines, IA

2021 Street Improvements
Infrastructure
Results
$178,000 est. value
Hiawatha, IA 52233

Duane Arnold Solar I
New Construction, Infrastructure
Pending Verification
$64,000,000 CJ est. value
Palo, IA 52324

Platinum Pointe Townhomes
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
West Des Moines, IA 50266

Meredith Drive Preservation 104th Street to 121st Street - ST22-04 - City of Urbandale
Infrastructure
Conception
$1,200,000 est. value
Urbandale, IA 50323

Last Updated 08/12/2022 11:32 AM
Project Title

Alley Improvements Project Division I and II

Physical Address View project details and contacts
City, State (County) Le Mars, IA 51031   (Plymouth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Division I - Grading, Excavation. Subgrade Preparation and Modified Subbase - Adjustment to Manhole Structures - 7" P.C.C Pavement - Pavement Removal - Temporary Traffic Control - Erosion Control Items - Precast Concrete Steps Division II - Grading, Excavation. Subgrade Preparation and Modified Subbase - Adjustment to Manhole Structures - 7" P.C.C Pavement - Pavement Removal - Temporary Traffic Control - Erosion Control Items - Precast Concrete Steps . Proposals will be acted on by the Le Mars City Council at a meeting to be held at said place at 12:00 P.M. on August 16, 2022 A certified check or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid shall be included in a separate sealed envelope, plainly marked "bid bond". The bid guarantee shall be forfeited as liquidated damages if the successful bidder fails proper execution. The checks or bid bonds of the lowest two or more bidders may be held for the earlier of 7 days after the effective date of the agreement or 61 days after the bid opening, whereupon Bid Security furnished by such bidders will be returned. Other checks or bid bonds will be returned after the tabulation of bids is completed. The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor. No submitted bids may be withdrawn for a period of thirty (30) days from the scheduled closing time for the receipt of bids. The Contractor will be paid monthly in an amount equal to ninety-five percent (95%) of the Work completed during the previous month according to the Engineer's estimate. The final payment will be made not less than thirty (30) days after completion of the Work and acceptance by the City. No final payment will be due until the Contractor has certified that the materials, labor, and services have been paid for in accordance with the Project Manual. The right to accept or reject any or all bids and to waive informalities is reserved. Any Division commenced during calendar year 2022 shall be substantially completed by the end of the calendar year 2022. All work shall be completed by June 30, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents