Similar Projects
West RON Apron Rehabilitation
Post-Bid
$22,000,000 est. value
Morrisville, NC 27560

18L/36R Rehabilitation and Taxiway C7 Removal
Post-Bid
Charlotte, NC

North Ramp Reconstruction
Results
Hickory, NC

Runway 5R-23L Rehabilitation Project Phase 3
Results
Greensboro, NC

North General Aviation Site Development and Pipe Ditches in FBO #2 Area
Post-Bid
Wilmington, NC 28405

Runway and Taxiway Pavement Rehabilitation
Results
Elm City, NC 27822

Albert J. Ellis Airport General Aviation Apron Expansion
Post-Bid
Richlands, NC

Parallel Taxiway
Results
NC

Crossfield Taxiway - Package 1
Post-Bid
Greensboro, NC 27409

Taxiway Reconstruction
Results
Burlington, NC 27215

Northwest Development - Phase 2
Post-Bid
Greensboro, NC 27409

Y--P222- Design-Bid-Build, Airfield Security Improvements, Marine Corps Air Station (Mcas), Cherry Point, North Carolina
Demolition - 3,003 SF
Results
$10,000,000 to $25,000,000 est. value
Camp Lejeune, NC 28533

Taxilane Rehabilitation Schedule I and Hangar Access Road Schedule II
Post-Bid
Morganton, NC 28655

Taxiway M Rehabilitation
Results
Charlotte, NC

T-Hangar and Taxilane Elkin Municipal Airport
Post-Bid
Elkin, NC 28621

Reported 04/23/2019 12:00 AM
Project Title

Elevated Roadway Repairs

Physical Address View project details and contacts
City, State (County) Greensboro, NC   (Guilford County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description The work may be generally described as repairs to be performed at the 40-year-old elevated cast-in-place and pre-cast concrete elevated roadway that provides access to the airport terminal, temporary parking, and top level of the adjacent parking garage. The work generally involves concrete removal/replacement and rehabilitation as well as drainage enhancements, and removal and replacement of expansion joints and sealant joints at the elevated roadway. The work also involves rehabilitation to sidewalks adjacent to the fountain and within the tunnels at the ground level. Removal and replacement of the roofs, guardrails, and expansion joints as well as brick repairs and tuckpointing at the four (4) stair towers is also included within the work.
Details
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents