Similar Projects
Main Avenue Improvements - 36375 - City of Aztec
Infrastructure
Conception
$3,558,838 CJ est. value
Aztec, NM 87410

Main Avenue Improvements - 36375 - City of Aztec
Infrastructure
Conception
$3,558,838 CJ est. value
Aztec, NM 87410

East Aztec Arterial Phase 2 - New Mexico Department of Finance and Administration
Infrastructure
Design
$17,045,150 CJ est. value
Aztec, NM 87410

East Aztec Arterial Phase 2 - New Mexico Department of Finance and Administration
Infrastructure
Design
$17,045,150 CJ est. value
Aztec, NM 87410

RFP - San Juan Lateral Water Treatment Plant (SJLWTP)
New Construction, Infrastructure
Bidding
$350,000,000 CJ est. value
Waterflow, NM 87421

30th Street Waterline Replacement from Hutton Ave to Tulane Ave
Infrastructure
Bidding
$1,000,000 CJ est. value
Farmington, NM 87401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021 Manhole and Water Valve Adjustment
Infrastructure
Results
$291,400 est. value
Farmington, NM

Hydro Excavation, Multi-Term Contract
Infrastructure
Results
Farmington, NM

Welding Facility San Juan College
New Construction, Renovation, Infrastructure
Pending Verification
$650,000 CJ est. value
Farmington, NM 87401

Farmington Residential Subdivision
New Construction, Infrastructure
Pending Verification
$21,500,000 CJ est. value
Farmington, NM 87401

Hartman Sports Complex - 23882 - City of Aztec
New Construction, Infrastructure
Conception
$3,800,000 CJ est. value
Aztec, NM 87410

North Main Avenue Extension - New Mexico Department of Finance and Administration
Infrastructure
Design
$3,000,000 CJ est. value
Aztec, NM 87410

Construct the Red Valley Transfer Station Access Road Project
Infrastructure
Post-Bid
NM

Last Updated 05/25/2023 09:18 AM
Project Title

Roadway Improvements - Roads 6405 and 6411

Physical Address View project details and contacts
City, State (County) Kirtland, NM 87417   (San Juan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $252,120 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Name and Description of Project: Town of Kirtland Roadway Improvements, Roads 6405 and 6411 Project includes: Roadway improvements for Roads 6405 and 6411 including removal of existing asphalt pavement, grading, subgrade preparation, new base course and asphalt pavement, adjustment of utilities to grade, relocation of signs, and temporary construction traffic control. Question Deadline 03/01/2023 at 5:00 PM MT Submitted to Engineer in writing at: DTF Engineering Daniel T. Flack, P.E. dflack@dtfengineering.com

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents