Donlin Gold Natural Gas Pipeline
New Construction, Infrastructure
Conception
$1,122,300,000 CJ est. value
Anchorage, AK 99501

Aurora Harbor Rebuild-Phase III - City and Borough of Juneau
Infrastructure
Conception
$4,000,000 CJ est. value
Juneau, AK 99801

Contractor - Port of Nome Modification Phase 1
Infrastructure
Design
$180,000,000 to $200,000,000 est. value
Nome, AK

Sourdough Campground Bridge
Demolition, New Construction, Infrastructure
Design
$4,132,557 CJ est. value
Gakona, AK 99586

Quartz Creek Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Cooper Landing, AK 99572

RFP D/B - AK NPS DENA 10(49), Polychrome Pass Area Improvements
New Construction, Infrastructure
Bidding
$75,000,000 CJ est. value
Denali Park, AK 99755

RFP Design - Achemak Selo School Schematic Design
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Fritz Creek, AK 99603

Central Emergency Services Arc Loop Training Pad Expansion
Infrastructure
Post-Bid
Kalifornsky, AK 99669

Tanana Lakes Recreation Area Trailhead Kiosks
Infrastructure
Results
Fairbanks, AK 99701

Nanwalek-Port Graham Airport Relocation Drilling Services
Term Contract, Infrastructure
Results
$1,000,000 to $2,500,000 est. value
AK

Ted Stevens Anchorage International Airport UPS Expansion
Addition, Infrastructure - 1,350,000 SF
Pending Verification
$110,000,000 CJ est. value
Anchorage, AK 99501

St. Hermans Theological Seminary
Addition, Demolition, New Construction, Renovation, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Kodiak, AK 99615

Egan Drive Water Crossings Repl, Norway Point, Highland Drive, Salmon Creek - City and Borough of Juneau
Infrastructure
Conception
$800,000 CJ est. value
Juneau, AK 99801

Carroll Way Multi-Residential Development
New Construction, Infrastructure
Design
$7,500,000 CJ est. value
Kodiak, AK 99615

MP52.14 Rockfall Mitigation
Infrastructure
Bidding
$220,000 CJ est. value
Anchorage, AK 99501

Last Updated 10/13/2022 03:13 PM
Project Title

Port of Nome Modification - U.S. Army Corps of Engineers

Physical Address View project details and contacts
City, State (County) Nome, AK 99762   (Nome County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2025
Bids Due View project details and contacts
Estimated Value $618,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The plan calls for nearly doubling the length of the port's west causeway to reach close to 2,100 feet farther into Norton Sound with a nearly 1,400-foot breakwater to protect harbor entrance from incoming waves. The L-shaped barrier would also hold two new 450-foot and one new 600-foot dock to handle the larger vessels. The existing east causeway-breakwater would be demolished and replaced with a larger, 3,900-foot causeway-breakwater that would greatly expand the port's outer basin. Approximately three-quarters of the material from the existing east causeway would be used to build its replacement. The $618 million price tag breaks down: $386 million funded by the federal government $123 million would come from the City of Nome for the navigation features $128 million for infrastructure deemed "local facilities" such as access roads, docks, utilities and other items As of October 13, 2022, this project is conceptual. The Port of Nome Modification Feasibility Study is the latest iteration in a series of proposals made over the past decade to upgrade maritime facilities along Alaska's largely undeveloped western coast. Local government leaders are working with consultants on a plan to fund the project from several possible sources, but they are not yet ready to disclose the details. The US Army Corps Alaska District approved the project. The US Congress need to appropriate funding for the federal portion of the project in a spending bill. Bidding for designers and contractors has not been established. A firm construction timeline is not available. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents