Similar Projects
Railroad Avenue – CDBG 2016 – Water and Sewer System Improvements
Post-Bid
Cochran, GA

Magnolia Drainage Improvements
Post-Bid
Less than $275,000 est. value
Tifton, GA

Tradeport East Rough Grading and Drainage Improvements
Results
Less than $563,843 est. value
GA

Mobley Park Storm Drainage Improvements
Results
Port Wentworth, GA

Storm Drainage Improvements FY2018 CDBG
Post-Bid
Irwinton, GA 31042

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

Replacement of the Streets and Drainage Improvements
Post-Bid
Jesup, GA 31545

Exit 18 Erosion Control and Welcome Sign Installation
Results
La Grange, GA 30240

36” CMP Rehabilitation
Post-Bid
GA

Cherry-Church-Blanchard-King Avenues Drainage Improvements
Results
Pine Mountain, GA

T32-D6-Drainage Rehab-Pickens-97322
Post-Bid
GA

Sequoia Circle Drainage Improvements Phase II
Results
Hinesville, GA 31310

Drainage Base and Pave Construction
Post-Bid
Lyons, GA 30436

Pooler Old Town Drainage - Project B
Results
Less than $811,700 est. value
Pooler, GA 31322

T32-D6-Drain Rehab-Chattooga-97769
Post-Bid
GA

Reported 10/16/2020 12:00 AM
Project Title

Beechwood Circle Drainage Replacement

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30046   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed by the Contractor consists of but is not limited to: 1. Demolition and removal of existing CMP Pipe storm drain pipe system, concrete driveway, shrubbery, etc. as shown on the plans. 2. Install complete new 24”HDPE pipe and tie-in to existing structures, including stone bedding and backfill up to spring elevation with # 57 stone. 3. Reset existing headwall and install fresh Rip Rap at headwall, install sod/mulch at all areas that will be disturbed including erosion control & BMP’s. 4. Install complete, concrete driveway, curb & gutters & cleanup including re-grout exist. structures

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents