Similar Projects
Replace MEP Systems at Lecture Center at SUNY New Paltz
Post-Bid
New Paltz, NY 12561

FAB Heating Upgrade
Post-Bid
New Paltz, NY 12561

Install Ductless Air Conditioner
Results
Less than $25,000 est. value
Saugerties, NY 12477

Upgrade Lecture Center Mechanical Systems at SUNY New Paltz
Results
$5,000,000 to $10,000,000 est. value
New Paltz, NY 12561

HVAC Engineering/Design for Trudy Resnick Farber Building
Term Contract
Post-Bid
Ellenville, NY 12428

HVAC Replacement for SUNY Ulster Burroughs Hall
Term Contract
Results
Stone Ridge, NY 12484

HVAC Replacement for SUNY Ulster Campus
Post-Bid
Marbletown, Stone Ridge, NY 12484

Ellenville Middle / High School HVAC Improvements
Results
Ellenville, NY 12428

KHS Kate Walton Field House Pool Dectron RTU Replacement
Post-Bid
Kingston, NY 12401

HVAC Control System Upgrade Ulster County Courthouse
Results
Kingston, NY 12402

Clean & Tunes of Gas and Oil-Fired Furnaces, and Gas and Oil-Fired Water and Steam Boilers
Term Contract
Post-Bid
NY 12401

HVAC Maintenance
Term Contract
Results
$50,000 to $500,000 est. value
Highmount, Lake Placid, North Creek, Wilmington, NY

Preventive Maintenance for Automated Logic HVAC Controls
Term Contract
Post-Bid
Kingston, NY 12401

Job Order Contracting Services for Region 3 - HVAC
Results

HVAC/Refrigeration Replacement & Maintenance
Term Contract
Post-Bid

Last Updated 11/21/2019 08:28 AM
Project Title

Smiley Art Building Art Storage AC Upgrade at SUNY New Paltz

Physical Address View project details and contacts
City, State (County) New Paltz, NY 12561   (Ulster County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Recycling and disposal of all construction waste for installation of (2) new indoor units and (2) new outdoor units that will provide space conditioning to rooms 107 and 109 respectively. Work to include, but not be limited to, providing piping work to connect cold water and waste, as well as refrigerant piping between the indoor and outdoor units. Electrical power will be brought in overhead via drop ceiling conduit run, then distributed to outdoor units through crawl space.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents