Similar Projects
Edible Art Culinary Food Park
New Construction
Conception
Longview, TX 75601

Hoots Wings
Build-Out - 2,400 SF
Conception
Longview, TX

Starbucks
New Construction
Design
Longview, TX 75602

Chick-fil-A
Renovation - 3,500 SF
Design
$375,000 est. value
Longview, TX 75604

Smallwoods Manufacturing Facility
Renovation - 205,920 SF
Post-Bid
Longview, TX 75601

Fire Station No. 3 Renovations
Renovation - 1,150 SF
Results
Kilgore, TX 75662

Police Department
Results
$26,000,000 est. value
Longview, TX 75604

Dairy Queen
New Construction - 3,007 SF
Construction
$500,000 to $1,000,000 CJ est. value
Kilgore, TX 75662

Starbucks
New Construction - 2,500 SF
Construction
$500,000 to $1,000,000 CJ est. value
Longview, TX

Starbucks
Renovation - 3,000 SF
Design
$200,000 est. value
Longview, TX 75605

Fire and Police Training Center
New Construction
Results
Longview, TX

Bubba's 33
Addition
Construction
Longview, TX 75605

Work Smart Office Building
New Construction - 15,400 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Longview, TX 75605

Longview Economic Development Offices
New Construction - 8,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Longview, TX 75601

Chick-fil-A
New Construction - 5,000 SF
Construction
$900,000 est. value
Kilgore, TX 75662

Reported 01/13/2022 12:00 AM
Project Title

Design - Build Services New Fire Station

Physical Address View project details and contacts
City, State (County) Longview, TX 75605   (Gregg County)
Category(s) Commercial, Government/Public
Sub-Category(s) Fire/Police Station, Food/Beverage Service, Office
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of pre-construction and construction services for a new fire station at Henderson Lane and Tryon Road. The station will be approximately 11,000 square feet utilized by the Judson Fire Department. The project will include a facility that has a minimum of 8 apparatus bays, living quarters, office space, meeting rooms and fitness facilities.

Details

Fire/Police Station, 11,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Refrigerated Display Equipment, Unit Kitchens, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents