Similar Projects
Final Effluent Pump Station And Stormwater Channel Improvements
New Construction
Conception
$12,754,000 est. value
San Jose, CA 95134

Kelley Park Outfall - City Of San Jose
Infrastructure
Conception
$772,000 est. value
San Jose, CA 95112

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

BVF Comfort Station and Water Supply
New Construction
Design
$1,000,000 to $5,000,000 est. value
Yosemite National Park, CA

Pump Station Recovery Mitigation Project
Renovation
Bidding
Long Beach, CA

MD 10A Dublin Plant Storage Tank and Booster Pump Station
New Construction, Infrastructure
Bidding
$2,305,677 to $2,305,677 est. value
Madera, CA

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Gregory Gardens Storm Drain Rehabilitation
Infrastructure
Post-Bid
$1,320,000 to $1,320,000 est. value
Pleasant Hill, CA 94523

Plant Structural Improvements
New Construction
Results
$2,500,000 est. value
Modesto, CA 95351

Z--CA-Stone Lakes NWR-Pumps Station Replace
Renovation
Results
Elk Grove, CA 95757

Water Booster Pump Station Upgrades - City of Petaluma
Infrastructure
Conception
$1,700,000 est. value
Petaluma, CA 94952

Fort Baker Sewer and Manhole
Term Contract
Design
Mill Valley, CA 94941

Panther Gap Road PM 0.50 Storm Damage Repair Project
Infrastructure
Bidding
$2,844,580 est. value
CA

LillyHill & L Street Water Booster Station
Renovation
Post-Bid
$1,500,000 est. value
Needles, CA 92363

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

Reported 07/11/2022 02:05 PM
Project Title

Rio Cosumnes Correctional Center - Sewer Grate Before S21 Pumping Station - P148217 - Sacramento County

Physical Address View project details and contacts
City, State (County) Elk Grove, CA 95757   (Sacramento County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024, Construction Completion Expected December 2025
Bids Due View project details and contacts
Estimated Value Less than $560,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Elk Grove, California. Conceptual plans call for site work for a water / sewer project. This project will design and install a sewer grate system before S21 Pumping Station to remove foreign debris (i.e. shoes, sheets, uniforms, etc) from water before entering the pumping station Project is included Sacramento County FY 2022-2023 CIP

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents