Similar Projects
Becker Storm Drainage - City of Emporia
Infrastructure
Conception
$700,000 est. value
Emporia, KS

Southwest Gage and Southwest 7th Stormwater Replacement - Southwest Gage Boulevard to Southwest 7th St
Infrastructure
Bidding
$800,000 est. value
Topeka, KS 66606

Cedar Street and Oak Street Storm Sewer Improvements
Infrastructure
Bidding
$350,000 est. value
Ottawa, KS 66067

49th and Quivira CMP Stormwater Replacement
Infrastructure
Post-Bid
Shawnee, KS

2021 Stormwater Pipe Repair East
Infrastructure
Post-Bid
Shawnee, KS

Stormwater Improvement Project
Infrastructure
Results
Topeka, KS 66630

Street and Storm Sewer Benefit District
Infrastructure
Results
Topeka, KS

Water, Sewer, and Storm Water for Cedar Ranch Estates Phase 2
Infrastructure
Bidding
$500,000 est. value
Derby, KS

Fairlawn and Cedar Crest Stormwater Improvement
Infrastructure
Post-Bid
Topeka, KS 66606

North East Seward Bulb-Out
Infrastructure
Results
Topeka, KS 66616

Derby Destination Development Ii - Phase Ii
Infrastructure
Post-Bid
Derby, KS

Aquarian Acres Stormwater Improvements
Infrastructure
Results
Topeka, KS 66605

On-Call Contractor Services for Stormwater Rehabilitation Emergency
Term Contract
Post-Bid
Wichita, KS

Storm Water Drain 481 to serve Willow Creek East 3rd Addition
Infrastructure
Results
Wichita, KS

2022 Stormwater Pipe Video Inspection
Infrastructure
Post-Bid
Shawnee, KS

Reported 07/05/2022 11:21 AM
Project Title

Becker Addition Stormwater Improvements - City of Emporia

Physical Address View project details and contacts
City, State (County) Emporia, KS   (Lyon County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected May 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Emporia, Kansas. Design plans call for site work for a water / sewer project. Plans call for the areas between Interstate 35 and 30th Avenue and along and east of Prairie Street to the Neosho River. As of July 1, 2022, this project is in design. The construction documents completion timeline has not been identified. A tentative bid schedule for contractors has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents