Project Title | Niles Dart 2023 Site Improvements |
Physical Address | View project details and contacts |
City, State (County) | Niles, MI 49120 (Berrien County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $450,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Prevailing wages as determined by the federal Davis Bacon Act shall apply. All bidders are required to sign a certification that they will comply with all Federal and State nondiscrimination laws and regulations. 1 Curb Remove, Modified 255 LFT 2 Machine Grading, Modified 295 SYD 3 Subgrade Undercut, Type II, CIP 65 CYD 4 Dr Structure, Modified 1 EA 5 Curb, Conc, Detail E2 Modified 242 LFT 6 Cold Milling, 1-1/2" 700 SYD 7 Pavm't, Conc 8", Modified 2,500 SFT 8 HMA, 36A, 165#/SYD 65 TON 9 Pavmt Marking (Match Existg) 1 LS 10 Contractor Staking 1 LS The successful bidder will be required to furnish satisfactory 100% performance bond as well as labor and material bond and a 100% maintenance bond (for 1 year). A certified check or bidders bond in an amount of not less than five percent (5%) of the amount of the bid will be required with each bid. Bids submitted without the certified check or bidders bond will not be accepted. The City reserves the right to reject any or all bids, to waive irregularities in bids and to accept the bid that in the opinion of the City Council is most advantageous to the City. No bid shall be withdrawn after the opening of bids for a period of ninety (90) days after the scheduled time of receiving bids. The contractor shall commence work under this contract as soon as possible and shall fully complete all work under this contract by Friday, September 29 Once work th , 2023. commences, all work shall be completed within 60 calendar days. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |