Similar Projects
Sally Port Doors Replacement
Alteration
Bidding
Lexington, KY 40510

Maintenance, Repair and Operations (MRO) Trade Services
Renovation, Alteration
Bidding
Lexington, KY

Vaughn Warehouse - Hi-Speed Roll Up Doors
Post-Bid
Lexington, KY 40504

LTS Buildings 100, 200, and 300 Window Replacement
Post-Bid
Lexington, KY

Flammable Storage Building Doors Replacement
Results
Lexington, KY

Polk Dalton Exterior Doors
Alteration
Results
$100,000 est. value
Lexington, KY 40507

Window Assessment with Replace/Repair and Building Wash and Seal
Alteration
Post-Bid
Lexington, KY 40508

PAV HA - OR Suite Doors
Alteration
Results
$272,000 est. value
Lexington, KY 40508

Window Replacement - Peterson Service Building
Alteration
Post-Bid
Less than $700,000 est. value
Lexington, KY 40508

Town Branch Scum Facility Improvements
Renovation, Alteration
Results
Lexington, KY 40504

Window Glazing and Building Exterior Caulking
Alteration
Post-Bid
Lexington, KY

PAV H North Wing Replace Windows
Alteration
Results
$200,000 est. value
Lexington, KY

New Wilson Door and Window Replacement and Scattered Sites Storm Doors
Alteration
Post-Bid
Lexington, KY

Material Recycling Center Overhead Door Installation
Alteration
Results
Lexington, KY

BCTC Leestown Window Replacement
Alteration
Results
$198,000 est. value
Lexington, KY 40511

Last Updated 02/08/2022 12:32 PM
Project Title

Bradley Hall Window Replacement

Physical Address View project details and contacts
City, State (County) Lexington, KY 40508   (Fayette County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $285,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The objectives of the Bradley Hall window replacement project includes, but is not necessarily limited to: 1. Replacing the exterior window framing, 2. Repairing of the interior window trim as required due to rot/breakage on-site; including painting of trim to match existing trim, 3. Replacing the windows, 4. Clean stone under wooden sills, 5. Review the interior for replacement of the interior window stops, 6. Any additional work associated with the removal/disposal of the existing blinds and patch/paint the trim where removed.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents