Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

Design-Build Services for Electrical and/or HVAC Infrastructure Improvements
Alteration
Bidding
$4,000,000 est. value
Burgaw, NC

Crown Boiler Retubing and Burner Upgrade
Infrastructure
Bidding
Fayetteville, NC 28306

Remove and Replace (2) HVAC Systems
Post-Bid
Elizabeth City, NC 27909

HVAC, Electrical and Plumber Contractors for Home Energy Improvement Project - NC Weatherization Assistance Program
Renovation
Post-Bid

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

Legacy and Jones Residence Halls Make-up Air
Results
Less than $1,655,170 est. value
Greenville, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

Installation and Integration of Needlepoint Bipolar Ionization in HVAC Systems
Alteration
Bidding
New Bern, NC 28562

Install an Underground Compressed Air Piping System
Post-Bid
Elizabeth City, NC

Cooling Tower Replacement Smith High School Project
Results
Greensboro, NC 27406

Central Office - Alternate School HVAC Upgrades
Alteration
Bidding
Halifax, NC 27839

HVAC Upgrades - Riverside Campus
Post-Bid
Louisburg, NC 27549

2019-2020 - Mechanical HVAC Upgrades to Flat Rock and Rugby Middle Schools
Results
East Flat Rock, Hendersonville, NC 28726

HVAC Replacements for Wilson Hall
Post-Bid
Chapel Hill, NC 27514

Last Updated 10/05/2021 10:16 AM
Project Title

Rosewood Elementary Chiller Replacement

Physical Address View project details and contacts
City, State (County) Goldsboro, NC 27530   (Wayne County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of work is as follows: Provide and install the following Equipment: (2) Trane CGAM 130 Ton Chillers Demo and remove existing equipment, piping controls and electrical as required. Disposal of the existing equipment as required to meet the EPA guidelines. Provide and install new hydronic piping to connect the existing piping to the new chiller equipment as required. Provide and install the appropriate chill water piping accessories such as strainers, flex connectors, butterfly valves thermometers and psi gauges as required. Provide and install new heat tracing on all exterior piping as required. Insulate all exterior chilled water piping with 2” fiberglass with aluminum jacket as required. Provide and install electrical materials needed to connect to new chillers as required. Ensure the chillers listed above include BACnet cards for connecting to building automation controls. Connect the equipment listed above to new Siemens HVAC controls located in boiler room of the building the new equipment will serve.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents