Similar Projects
Last Updated | 01/24/2023 04:21 PM |
Project Title | The Cleanwater Center Project |
Physical Address | View project details and contacts |
City, State (County) | Sunnyvale, CA 94089 (Santa Clara County) |
Category(s) | Green Building, Heavy and Highway, Laboratory, Sewer and Water |
Sub-Category(s) | Laboratory, LEED Certified, Paving/Reconstruction, Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Schematic Drawings, Construction start expected January 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $42,000,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project will be divided into two packages. Project 833240- Cleanwater Center- Stage 1, along with Project 835530- Cleanwater Center- Stage 2, entails constructing a new Cleanwater Center that will house administrative, outreach, operations, laboratory, compliance inspection, and maintenance functions. The new Cleanwater Center will replace the functionality of the existing Administration Building, Laboratory/Control Building, Compliance Inspection Building, and Maintenance Building. As a result, the existing buildings will be demolished. In order to stay within the Program budget, Stage 1 is included in this funded project and Stage 2 is an unfunded project. The scope of Stage 1 is limited to design of the Cleanwater Center through 90% design, landscaping and design and construction of the Recycle Yard parking lot, including 95 parking stalls. Stage 2 will complete the design and construction of the 29,000 SF multi-story Cleanwater Center, which has been deferred until funding is identified. The Architectural Design phase of the project started in FY 2016/17 and ends in FY 2021/22. As of July 14, 2022, these projects are included in the City of Sunnyvale FY 2021-2041 CIP. Stage 1 of the project is in design. The City has not determined a timeline for bid; however procurement will follow standard City procurement process and be publicly advertised to bid on DemandStar. Construction is tentatively estimated to begin in 2022/ 2023. *The closed solicitation has been included below for reference: SEALED BIDS will be received by the City of Sunnyvale at the Purchasing Division from qualified firms to furnish the goods and/or services identified in the specifications document or The City of Sunnyvale is accepting proposals from qualified firms to furnish the goods and/or services identified in the specifications document. The City of Sunnyvale is seeking proposals from qualified Architectural/Engineering firms (Consultant) to provide professional services for design and preparation of bid documents and construction support for the Administration and Laboratory Building at the Sunnyvale Water Pollution Control Plant (WPCP) as specified herein. The scope of work generally includes; Preparation of preliminary design, Design development, Bid documents, Bidding/construction support. ALL PROSPECTIVE BIDDERS/RESPONDENTS ARE HEREBY CAUTIONED NOT TO CONTACT ANY MEMBER OF THE CITY OF SUNNYVALE STAFF OR OFFICIALS OTHER THAN THE SPECIFIED CONTACT PERSON. Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. |
||||||||||||||||||||||||||||||||||||||||||||
Details | 2 Stories Above Grade, 29,900 SF.
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |