Similar Projects
Lagomarcino Hall-Roof Replacement-Sections C, G, and H
Alteration
Bidding
$500,000 est. value
Ames, IA 50011

Wastewater Treatment Plant Roof Replacement Project
Alteration
Bidding
$98,505 est. value
Sioux City, IA 51106

Roof Tear-Off and Replacement
Alteration
Post-Bid
Clinton, IA

Sheriff Office - Roof Removal and Replacement
Alteration
Post-Bid
Dubuque, IA 52001

Young Arena Southeast and Southwest Roof Replacement
Alteration
Results
Waterloo, IA 50701

Residential Roof Removal and Replacement
Alteration
Results
IA

Unit 9 FGD Upper Roof Replacement
Alteration
Bidding
$200,000 est. value
Muscatine, IA

2022 Roof Replacement at Gaylord Smith Building
Alteration
Post-Bid
Sioux City, IA 51106

2021 College Community Roof Improvements
Alteration
Results
$630,000 est. value
Cedar Rapids, IA 52404

University of Northern Iowa - Wellness Recreation Center Roof Replacement Phase 1
Alteration
Bidding
$2,239,850 est. value
Cedar Falls, IA 50613

Parks Roof Replacements
Renovation, Alteration
Post-Bid
Cedar Rapids, IA

Tower Roof Replacement at J Avenue Water Treatment Plant
Alteration
Results
Cedar Rapids, IA 52402

Replacement of EPDM Roof at the Carlisle Maintenance Garage
Alteration
Bidding
$300,000 est. value
Carlisle, IA 50047

J Avenue Water Treatment Plant Lime Silo Dust Collector and Roof Improvements
Alteration
Post-Bid
$385,000 est. value
Cedar Rapids, IA 52402

Camp Dodge Building M-15
Renovation, Alteration
Results
Johnston, IA 50131

Last Updated 05/23/2022 11:58 PM
Project Title

Construction of the Sioux Gateway Airport Roof Replacement (Phase 1) Project

Physical Address View project details and contacts
City, State (County) Sioux City, IA 51111   (Woodbury County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at the Sioux Gateway Airport Terminal, 2403 Aviation Boulevard and includes the removal of the existing roof system and installation of a new roof system. The new roof system includes new roof insulation, TPO (thermoplastic polyolefin) membrane, and fascia.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents