Similar Projects
East State Boulevard Concrete Rehabilitation
Infrastructure
Bidding
$400,000 est. value
Fort Wayne, IN 46895

Lincoln Highway Improvements
Post-Bid
New Haven, IN 46774

Veterans Museum & Memorial Parking Lot Improvements
Post-Bid
Fort Wayne, IN 46818

Northrop High School West Site Improvement
Results
Fort Wayne, IN 46800

Alley Reconstruction
Results
Fort Wayne, IN 46802

2021 Street Package
Infrastructure
Post-Bid
New Haven, IN

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

2021 Right of Way On Call
Term Contract, Infrastructure
Post-Bid
Fort Wayne, IN

Roosevelt Park Boardwalk Improvements
Results
Fort Wayne, IN 46808

Concrete Pavement Restoration and Replace Superstructure
Infrastructure
Post-Bid
IN

Lake Avenue Trail: Hobson Road to Coliseum Boulevard
Results
Fort Wayne, IN 46800

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

2021 New Haven High School Track Resurfacing
Results
New Haven, IN 46774

Concrete Pavement Restoration and Replace Superstructure
Infrastructure
Post-Bid
Bloomington, IN 47404

Road Reconstruction
Results
IN

Last Updated 07/04/2022 12:16 AM
Project Title

Alley R00453 E-W: East Lewis Street, Hugh Street, McCulloch Street Ohio Street

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46895   (Allen County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

An east-west alley in the East Central Neighborhood Association bounded by E. Lewis St. to the north, Hugh St. to the south, Ohio St. to the west and McCulloch St. to the east. The existing concrete alley and approaches will be removed and replaced with a fourteen foot (14') wide concrete alley, new concrete approaches, sidewalk & 2' curbface sidewalk. Minor stormwater adjustments along with curb and restoration are included with this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents