Similar Projects
Juvenile Justice Center Tuckpointing
Infrastructure
Post-Bid
Poplar Bluff, MO

Masonry Repair to Include Tuck Pointing and Waterproofing at the Student Center and Arts and Sciences I Buildings at the Hillsboro campus
Alteration
Post-Bid
Hillsboro, MO 63050

Roof Repairs and Waterproofing
Alteration
Results
Affton, Hanley Hills, MO 63123

Facade Improvement - 510 Edmond
Alteration
Results
Saint Joseph, MO 64501

Grants Trail Bridge Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Saint Louis, MO 63103

Facade Improvement - 224 North 4th
Alteration
Results
Saint Joseph, MO 64501

High School and Middle School Gutter Replacement
Alteration
Post-Bid
Richmond, MO

Bearcat Stadium Stairs
Alteration
Results
Maryville, MO

Raytown Quality Schools Entry Glass Graphics
Alteration
Post-Bid
Kansas City, Raytown, MO 64133

305 Each Linear Feet Handrails
Infrastructure
Results
Saint Louis, MO

Building POW/MIA Block Retaining Wall
Alteration
Post-Bid
Hillsboro, MO 63050

2022 Capital Projects
Alteration
Results
Center, MO 63436

Vande East Apartments - Waterproofing (Facade)
Alteration
Post-Bid
Saint Louis, MO 63110

Facade Improvement Projects - 3 Locations
Alteration
Results
$300,000 est. value
Saint Joseph, MO

Golf Course Club House Exterior Repairs
Alteration
Post-Bid
$700,000 est. value
Olivette, MO 63132

Last Updated 08/17/2023 01:04 AM
Project Title

South Chaney Reclamation Project

Physical Address View project details and contacts
City, State (County) Jefferson City, MO 65101   (Cole County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $271,895 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes eight (8) acres of abandoned mine lands would be reclaimed. The hazardous features, including dangerous highwalls associated with a hazardous water body, will be sloped to grades no greater than 4:1. After final grading, the site will be graded to a gently sloping topography; all disturbed areas will be revegetated with a mixture of cool season grasses and legumes. MBE 10%, WBE 10% and SDVE 3%

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents