Similar Projects
Edison High School Walking Trail
Infrastructure
Design
$400,000 CJ est. value
Richmond, OH 43944

Edison High School Walking Trail
Infrastructure
Design
$400,000 CJ est. value
Richmond, OH 43944

SR 151 - Intersection
Infrastructure
Bidding
$527,159 CJ est. value
Dillonvale, OH 43917

SR 151 - Intersection
Infrastructure
Bidding
$527,159 CJ est. value
Dillonvale, OH 43917

2022 Jefferson County Road 16 Resurfacing Project
Infrastructure
Post-Bid
$600,000 est. value
Rayland, OH 43943

Warren Lane (etal) Resurfacing
Infrastructure
Post-Bid
$300,000 est. value
Wintersville, OH 43953

Chip Seal- D10-Chip Seal FY2022 North
Infrastructure
Results

Chip Seal -JEF107513
Infrastructure
Results
OH

Montauk Renewables Expansion at Apex Environmental Landfill
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Amsterdam, OH 43903

SR 7 Minor Rehabilitation - Pavement Primary System
Infrastructure
Design
$4,769,587 CJ est. value
Steubenville, OH 43952

Roadway Minor Rehab
Infrastructure
Bidding
$850,597 CJ est. value
Richmond, OH 43944

SR 134 - Culvert Replacement
Infrastructure
Post-Bid
$641,000 CJ est. value
Lynchburg, OH 45142

Slide Repair- JEF-SR-150-04.80
Infrastructure
Results
$503,000 est. value
OH

SR 150 - Roadway Major Rehab
Infrastructure
Design
$2,621,966 CJ est. value
Dillonvale, OH 43917

Dock Street Pipe Lining and Manhole Rehabilitation
Infrastructure
Bidding
$75,000 CJ est. value
Steubenville, OH 43952

Last Updated 03/31/2023 03:24 PM
Project Title

RFQ Engineering - ODOT Municipal Bridge Program - Alexander Street Bridge Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Toronto, OH 43964   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $830,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 31, 2023, this project was originally postponed and is now underway. This project is currently in pre-construction and pending awarded contractor. A firm timeline for construction has not been established, however construction completion is expected in October 2023. The closed solicitation has been included below for reference. Rehabilitation of the Alexander Street bridge over the Norfolk Southern Railroad. The project includes rehabilitation of the existing bridge deck, new approach slabs, backwalls and expansion joints. Guardrail, roadway pavement, shoulders, and pavement markings will also be replaced.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents