Similar Projects
Upgrade or Ventilation Fy22 NRM
Alteration
Design
$1,000,000 to $5,000,000 est. value
Loma Linda, CA 92354

Arrowhead Village, Cooling Tower Replacment
Alteration
Bidding
$150,000 est. value
San Bernardino, CA 92407

East Wing Mechanical Improvements
Renovation
Bidding
$4,500,000 CJ est. value
San Bernardino, CA 92410

District Warehouse Freezer Replacement
Renovation
Sub-Bidding
$322,890 CJ est. value
Ontario, CA 91762

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

District Wide HVAC Replacements 11 Campuses (COVID) - HVAC
Alteration
Results
$13,500,000 est. value
Hesperia, CA 92344

Cooling Tower Pump Repair
Alteration
Results
San Bernardino, CA

HVAC Upgrade at Silverado High School
Alteration
Post-Bid
Victorville, CA 92395

HVAC Repair Services in Riverside and San Bernardino Counties
Term Contract
Results

Heating Ventilation and Air Conditioning Services
Alteration
Post-Bid
CA

Preventive Maintenance of HVAC, Exhaust fans, Chillers, Cooling Towers
Term Contract
Results
Loma Linda, CA 92357

Career Training Center (CTC) Building 200 HVAC Removal and Replacement
Alteration
Post-Bid
Ontario, CA 91762

AVUSD: HVAC Replacement at Five Various Sites - Phase 2 Project
Alteration
Results
$500,000 est. value
Apple Valley, CA

Cooling Tower Motor Replacement
Infrastructure
Post-Bid
Loma Linda, CA 92357

Last Updated 09/24/2022 05:36 AM
Project Title

HVAC Upgrades at Cope Middle School

Physical Address View project details and contacts
City, State (County) Redlands, CA 92373   (San Bernardino County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Project Number- 15986, 21-181 A California type A or B license or equivalent is required to be held by contractor. Contractor must have current registration with CA Department of Industrial Relations. The Contractor and any subcontractor(s) shall pay not less than the specified prevailing rates of wages to all workers employed by them in the execution of the contract. The District is seeking DVBE participation with this bid. The work shall be commenced on the date stated in the District's notice to proceed, as provided in the Special Conditions, and as specified therein, shall be completed within ninety (90) Calendar Days from and after the date sated in such notice The Board of Trustees of the Redlands Unified School District reserves the right to accept or reject any and all bids, to waive any irregularities in the bids or bidding, to be sole judge as to the merit, quality and acceptability of labor and materials proposed and their compliance to the plans and specifications, if it be in the best interest of the District. THIS PROJECT SHALL INCLUDE, THE FOLLOWING: MINOR DEMOLITION HVAC UNIT REPLACEMENT MINOR STRUCTURAL WORK LOW VOLTAGE AND ELECTRICAL POWER

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents