Similar Projects
Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Hospital Channel - Yucca Valley
Infrastructure
Conception
$5,901,359 CJ est. value
Yucca Valley, CA 92284

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Design
$275,000,000 CJ est. value
Redlands, CA 92373

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

9/11 Memorial Park
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Rancho Cucamonga, CA 91730

Maroon Bell - Winchester Water Main Replacement
Infrastructure
Bidding
$2,360,000 CJ est. value
Chino Hills, CA 91709

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

Asphalt Seal and Stripe - East Side
Infrastructure
Post-Bid
$300,000 CJ est. value
Victorville, CA 92395

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Stanfield Cutoff Restroom Site Preparations Project
Infrastructure
Results
$300,000 est. value
Big Bear Lake, CA

O'Reilly Auto Parts (CL3) #6229 / Colton
New Construction, Infrastructure - 7,319 SF
Construction
$2,000,000 CJ est. value
Colton, CA 92324

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Silver Peak Solar Project
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Adelanto, CA 92301

Dupont Avenue Pavement Rehabilitation - City of Ontario
Infrastructure
Conception
$195,000 CJ est. value
Ontario, CA 91761

Last Updated 07/24/2023 09:36 AM
Project Title

Iron Mountain Pumping Plant Operation and Maintenance Building Demolition and Abatement

Physical Address View project details and contacts
City, State (County) Earp, CA 92242   (San Bernardino County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $65,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of demolition and abatement of materials containing asbestos and lead in approximately 1200 square feet of flooring tile and underlying mastic, 1200 square feet of ceiling to rafters, and 1200 square feet of drywall to the studs, protection of existing surfaces not removed, and other appurtenant work as specified. Q&A Deadline 08/03/2023 2:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% The successful bidder and its agents, employees, and subcontractors shall comply with provisions of the California Labor Code, including those relating to payment of prevailing rates of wages. Estimated cost of contract. Metropolitan expects the total cost of construction to range between $40,000 and $65,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents