Similar Projects
Last Updated | 02/14/2024 02:34 PM |
Project Title | RFQ Engineering - Fourth Parallel Runway Program |
Physical Address | View project details and contacts |
City, State (County) | Charlotte, NC 28208 (Mecklenburg County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Request for Qualifications, Construction start expected February 2024 |
Bids Due | View project details and contacts |
Estimated Value | $916,940,603 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | https://www.bizjournals.com/charlotte/news/2024/02/12/clt-airport-american-airlines-transit-travel.html The lone exception: a $1 billion, fourth parallel runway scheduled to open in 2027. _________________________ The Fourth Parallel Runway Program for Charlotte Douglas International Airport (CLT or the Airport) consists of the design and construction of a new Fourth Parallel Runway (New Runway) and two EndAround Taxiways (EATS). The New Runway will be 10,000 feet long and 150 feet wide, meeting FAA's Aircraft Approach Category (AAC) and Airplane Design Group (ADG) V requirements. It will be supported by full-length parallel taxiways located on the east and west sides, and BY a system of associated entrance/exit taxiways between the parallel taxiway and the New Runway. The two EATs included in the Program are intended to reduce the number of active runway crossings. One EAT is on the north end of the New Runway and is referred to as the North End-Around Taxiway (NEAT); the second EAT is on the south end of the New Runway and existing Runway 18C-36C and is referred to as the South End-Around Taxiway (SEAT). Relocation of West Boulevard is another project included in the Fourth Parallel Runway Program to accommodate the Runway Protection Zone and the SEAT, but that project is the subject of a separate RFQ solicitation and construction bidding process. From qualified and experienced firms (individually or collectively, the "Firm") interested in providing design services for projects in the Fourth Parallel Runway Program (the "Work"). For purposes of this RFQ, there are three (3) projects which are identified as (1) the New Fourth Parallel Runway and associated system of taxiways (New Runway), (2) the North End-Around Taxiway - Phase 2 (NEAT-P2), and (3) the South End-Around Taxiway (SEAT) (collectively the "Runway Projects"). A Firm may submit a SOQ for consideration for any or all of these Runway Projects. 9/2/22 Deadline for Submission of Written Questions at 5pm EST. For questions please contact Gary Peeples - Gary.Peeples@cltairport.com |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |