Similar Projects
RFQ Engineering - West Boulevard Relocation
Infrastructure
Bidding
$17,000,000 CJ est. value
Charlotte, NC 28208

RFQ Design - Charlotte Douglas International Airport (CLT) Aircraft Rescue and Firefighting Facility
New Construction, Infrastructure
Bidding
$1,361,694 CJ est. value
Charlotte, NC 28208

Project Engineering Services for Minor Storm Drainage
Term Contract
Post-Bid
Charlotte, NC

Two-Dimensional Watershed Flood Modeling and Mapping
Infrastructure
Post-Bid
Charlotte, NC

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

Architectural/Engineering Services - Southwest Community Resource Center and East Community Resource Center
New Construction
Results
Charlotte, NC

RFQ - FY23-25 Fiscal Years Mecklenburg County Storm Water Services (MCSWS) Projects
Term Contract
Bidding
Charlotte, NC 28202

Utility Exploration
Alteration
Post-Bid
Charlotte, NC 28202

Engineering Services for the Implementation of Sustainable Infrastructure
Infrastructure
Results
Charlotte, NC

RFQ Design - East Mecklenburg High School Pavement Designs
Infrastructure
Bidding
$800,000 CJ est. value
Charlotte, NC 28202

Design - Architectural/Engineering Services for the Mecklenburg County Alcoholic Beverage Control Board HQ Building-Interior Redesign
Renovation, Alteration
Post-Bid
$2,000,000 est. value
Charlotte, NC 28206

Design Services for Huntersville Athletic Park Turf Field Project
Infrastructure
Results
Huntersville, NC 28078

RFQ - Design Services for Two Pond Dredging and Rehabilitation Projects
Infrastructure
Bidding
$4,600,000 CJ est. value
Charlotte, NC 28202

Engineering - Architectural and Engineering Services for Pedestrian Bridge
New Construction, Infrastructure
Post-Bid
$3,000,000 est. value
NC

Hvac Controls Replacement
Infrastructure
Results
NC

Last Updated 02/14/2024 02:34 PM
Project Title

RFQ Engineering - Fourth Parallel Runway Program

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28208   (Mecklenburg County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Request for Qualifications, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $916,940,603 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.bizjournals.com/charlotte/news/2024/02/12/clt-airport-american-airlines-transit-travel.html The lone exception: a $1 billion, fourth parallel runway scheduled to open in 2027. _________________________ The Fourth Parallel Runway Program for Charlotte Douglas International Airport (CLT or the Airport) consists of the design and construction of a new Fourth Parallel Runway (New Runway) and two EndAround Taxiways (EATS). The New Runway will be 10,000 feet long and 150 feet wide, meeting FAA's Aircraft Approach Category (AAC) and Airplane Design Group (ADG) V requirements. It will be supported by full-length parallel taxiways located on the east and west sides, and BY a system of associated entrance/exit taxiways between the parallel taxiway and the New Runway. The two EATs included in the Program are intended to reduce the number of active runway crossings. One EAT is on the north end of the New Runway and is referred to as the North End-Around Taxiway (NEAT); the second EAT is on the south end of the New Runway and existing Runway 18C-36C and is referred to as the South End-Around Taxiway (SEAT). Relocation of West Boulevard is another project included in the Fourth Parallel Runway Program to accommodate the Runway Protection Zone and the SEAT, but that project is the subject of a separate RFQ solicitation and construction bidding process. From qualified and experienced firms (individually or collectively, the "Firm") interested in providing design services for projects in the Fourth Parallel Runway Program (the "Work"). For purposes of this RFQ, there are three (3) projects which are identified as (1) the New Fourth Parallel Runway and associated system of taxiways (New Runway), (2) the North End-Around Taxiway - Phase 2 (NEAT-P2), and (3) the South End-Around Taxiway (SEAT) (collectively the "Runway Projects"). A Firm may submit a SOQ for consideration for any or all of these Runway Projects. 9/2/22 Deadline for Submission of Written Questions at 5pm EST. For questions please contact Gary Peeples - Gary.Peeples@cltairport.com

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents