Similar Projects
2022 Brecon WWTP Filter Addition
Renovation
Bidding
$300,000 CJ est. value
Talladega, AL 35160

Central Plant #3, Secondary Pumps Replacement
Renovation
Sub-Bidding
$2,300,000 CJ est. value
Birmingham, AL 35210

Plumbing Parts
Term Contract
Sub-Bidding
Huntsville, AL 35801

Copper Tubing
Term Contract
Post-Bid
Birmingham, AL

Plumbing and Waste Rough-in and Set-out for Six (6) Each Curry Court 1-Bedroom Apartments
Alteration
Post-Bid
Talladega, AL

Bottle Filler Stations and Installation
Alteration
Results
AL

Plumbing Services at the Jefferson Campus, Shelby-Hoover Campus, St. Clair-Pell City Campus and Chilton-Clanton Campus
Term Contract
Results
Birmingham, Clanton, Pell City, AL 35125

Plumbing Services
Alteration
Post-Bid
Mobile, AL

New Water Shut Offs for Projects AL 102-1 and AL 102-2
Alteration
Results
$200,000 est. value
Boaz, AL

Plumbing Services
Term Contract
Post-Bid
Huntsville, AL

Drainage Improvement Projects on Leiterman Ln, Shoots Ln, CR-87
Infrastructure
Results
$1,754,624 CJ est. value
Bay Minette, AL 36507

Lawrence County Courthouse - Roof Drain Repair
Alteration
Post-Bid
Moulton, AL 35650

Goodman Elevated Tank / Enterprise / AL
Renovation
Results
$139,650 CJ est. value
Enterprise, AL 36330

Service Contract - Plumbing Maintenance and Repairs for Various City of Mobile Facilities
Term Contract
Post-Bid
Mobile, AL

Water Supply Wells, Water Main Extensions Replacement, Water Meter Replacement
Renovation, Infrastructure
Results
$351,025 CJ est. value
Attalla, AL 35952

Last Updated 03/01/2023 09:59 AM
Project Title

Water Main Improvements for the Little Road Area

Physical Address View project details and contacts
City, State (County) Tallassee, AL 36078   (Elmore County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $283,409 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following labor and material items:2,500 LF - 6" PVC Water Main, PC 200 920 LF - 4" PVC Water Main PC 200 2 EA - 6" Gate Valve Assembly 2 EA - 4" Gate Valve Assembly 3 EA - 3" Gate Valve Assembly 4 EA - Fire Hydrant Assembly 1 EA - Post Hydrant Assembly The Owner requires the Project to be completed in 60 calendar days from date of Notice to Proceed. Bidders will be required to provide Bid security in the form of a Bid Bond or cashier's check in the amount of a sum no less than five (5) percent of the Bid Price but not more than$10,000.00. All bids must be submitted in a sealed envelope bearing on the outside the name of the bidder, bidder's license number, address, and name of the project. Your Bid will be required to be submitted under a condition of irrevocability for a period of 60days after submission. The Owner reserves the right to accept or reject any or all Bids.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents