Similar Projects
Sweetwater Club Drive Gas Station
New Construction - 7,500 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Lawrenceville, GA

C-Store and Retail
New Construction - 4,200 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Lawrenceville, GA 30043

Gas Station/Retail Store
New Construction - 29,400 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Duluth, GA 30096

Gas Station/Retail Store
New Construction - 29,400 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Duluth, GA 30096

QuikTrip #7132
New Construction - 8,292 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Bloomingdale, GA 31302

QuikTrip #7132
New Construction - 8,292 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Bloomingdale, GA 31302

Kroger #431-07
Renovation - 66,049 SF
Post-Bid
Roswell, GA

Hardee's/Convenience Store
New Construction - 4,670 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Stockbridge, GA 30281

Construction of a Compressed Natural Gas (CNG) Fueling Station
Results
Statesboro, GA

Bus Wash System
New Construction
Results
Savannah, GA 31401

Beaver Ruin Road Retail Centers and Gas Station
New Construction, Build-Out - 23,848 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Lilburn, GA 30047

Beaver Ruin Road Retail Centers and Gas Station
New Construction, Build-Out - 23,848 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Lilburn, GA 30047

Proposed C-Store
New Construction - 4,200 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Snellville, GA

QuikTrip
New Construction
Pending Verification
Buford, GA 30519

Express Car Wash
New Construction - 3,460 SF
Conception
$500,000 to $1,000,000 CJ est. value
Lawrenceville, GA 30043

Reported 07/06/2022 10:18 AM
Project Title

Peach Drive Convenience Store With Fuel Pumps

Physical Address View project details and contacts
City, State (County) McDonough, GA 30253   (Henry County)
Category(s) Commercial
Sub-Category(s) Car Wash, Gas Station, Supermarket/Convenience Store
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a convenience store with fuel pumps. As of July 5, 2022, this project is seeking approval from the Stockbridge Planning Commission. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Car Wash, New Construction, Gas Station, New Construction, Supermarket/Convenience Store, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents