Similar Projects
Meadows and Dells Drainage Improvements (Phase B)
Infrastructure
Bidding
$360,000 est. value
Coral Springs, FL

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

45th Year CDBG Drainage Improvement Project Northwest 7th Avenue
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Port Everglades, South Jetty Rehabilitation 2020, Broward County, Florida
Results
$1,000,000 to $5,000,000 est. value
FL

Shore Protection Project, Segment II, Beach Renourishment 2020-2021, Broward County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

Construction of WTP Lime Sludge Holding Ponds Sheet Piles
Term Contract
Post-Bid
$620,000 est. value
Hollywood, FL 33024

Sidewalk and Drainage Maintenance and Repair
Term Contract
Results
$525,000 est. value
Fort Lauderdale, FL 33301

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Lake Bank Barrier Restoration Pembroke Lakes Golf Course
Results
Less than $65,000 est. value
Pembroke Pines, FL 33026

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Sand Bypass Project at Broward County Port Everglades
Results
FL

Broward College Building 49 Drainage
Infrastructure
Post-Bid
FL

Meadows and Dells Drainage Improvements
Results
Less than $500,000 est. value
Coral Springs, FL

Drainage Project
Alteration
Post-Bid
Hollywood, FL 33024

Drainage Repair
Results
Less than $800,000 est. value

Last Updated 04/20/2022 09:22 AM
Project Title

Fabric-Formed Erosion Protection Project

Physical Address View project details and contacts
City, State (County) Southwest Ranches, FL 33332   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: Site #1 - SW 199th Ave & Griffin Road (South Side) Site #2 - SW 196th Lane & Griffin Road (South Side) The principal items of construction covered under this contract include, but are not limited to, excavation, site preparation, and the underwater installation of fabric-form revetment at the locations listed above. The fabric-form specifications and installation details are included in Exhibit J. The work included for the project shall include, but is not be limited to, the furnishing of all labor, materials, tools, equipment, machinery, superintendence, mobilization and services necessary for the complete installation of the Fabric-Formed Erosion Protection as indicated.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents