Similar Projects
Last Updated | 04/21/2022 11:09 PM |
Project Title | Water Main Connection Loop Along the North Side of Niobrara Avenue |
Physical Address | View project details and contacts |
City, State (County) | Chadron, NE 69337 (Dawes County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnishing all labor, equipment materials and incidentals necessary to properly construct a water main connection loop along the north side of Niobrara Avenue, between N. Mears Street and N. Maple Street. The water main shall be located along the back of curb of the north curb and gutter sections of Niobrara Avenue. The point of beginning shall be on the west side of North Mears Street. The project shall begin on the east side of the existing gate valve and at the termination of the previous installed 8 diameter PVC water main. The west termination shall end at the connection to an existing 8 diameter AC water main near the east edge of North Maple Street. The approximate length of the water main project is 750 lineal feet, including the installation of two fire hydrant assemblies with a six-inch diameter gate valve and box. There will be 11 water service taps to be installed on the new water main. The existing water main is located on the north side of the planned installation of the new 8 diameter water main. Water service to the existing dwellings shall be maintained during the installation of the new water main. There will be two water pressure tests and laboratory testing of the new water main installation. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |