Similar Projects
UV System Repair Buford L. Bryant Wastewater Treatment Plant
Renovation
Bidding
$2,000,000 est. value
Bayou La Batre, AL

Materials Only for Water System Improvements Project
New Construction
Bidding
New Site, AL

Shine Road Well Iron Treatment Facility
Post-Bid
Bayou La Batre, AL

South Parkway Water Treatment Plant Improvements
New Construction
Post-Bid
Huntsville, AL 35803

Wright Smith Jr. WWTP Headworks Replacement Project
Results
Mobile, AL

2019 Water System Improvements - Contract D New Water Treatment Plant
Results
Buhl, AL 35446

Arab Water Treatment Plant Improvements
Renovation
Post-Bid
$7,000,000 est. value
Arab, AL

Construction of Water Treatment Plant Filter Media Replacement
Results
Less than $182,400 est. value
Bessemer, AL

Betts WTP Miscellaneous Improvements
Renovation
Post-Bid
Opelika, AL

Wastewater Treatment Plant Lagoon Rehabilitation
Results
Oneonta, AL

Water Treatment Facility at the Larry Street Tank Site
New Construction
Post-Bid
Daphne, AL 36526

Water Treatment Plant Expansion
Addition
Results
$5,578,000 est. value
Owens Cross Roads, AL

Stickney WTP Building Replacements and Electrical Upgrade
Renovation
Post-Bid
Mobile, AL 36618

C. C. Williams WWTP Dewatering and Other Improvements
Renovation
Results
$19,000,000 to $24,000,000 est. value
Mobile, AL 36618

Northport WTP - Filter and SCADA Improvements - Phase I
Renovation, Alteration
Post-Bid
Northport, AL 35475

Reported 07/01/2022 12:00 AM
Project Title

Water Treatment Plant No. 3 Expansion

Physical Address View project details and contacts
City, State (County) Fairhope, AL   (Baldwin County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Water Treatment Plant No. 3 Expansion Project No. Wa002-22 Water Treatment Plant No. 3 Expansion. A Summary of the Work Items Is Included Below: Install a New Well Pump. Construct a New Treatment Building to Include Finished Water Pump Station, Electrical Room, and Chemical Room. Seflective Demolition and Reconfiguring the Existing Treatment Building, Clearwell, and Finished Water Pump Station Structure. New Fluoride, Sodium Hypochlorite, Liquid Lime, and Phosphate Chemical Feed Systems. Yard Piping to Accommodate the Improvements. Electrical Improvements.

Details

Water Treatment Plant, Addition.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents