Similar Projects
UT Erfo Uinta NF 70014(1) Santaquin Canyon Road
Design
$1,000,000 to $4,000,000 est. value
Santaquin, UT

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Bidding

1200 East Waterline Replacement and Roadway Improvement
Infrastructure
Bidding
Springville, UT 84663

Construction of the 2020 Provo City Streets Rehabilitation Project
Post-Bid
Provo, UT 84606

US-89; Improve Mobility/Safety in Orem City Limits
Post-Bid
$1,500,000 to $3,000,000 est. value
Orem, UT 84057

2019 Overlay Project
Results
Less than $294,507 est. value
Alpine, UT 84004

SR-68; MP 11 to MP 14.6 Rehabilitation High Volume
Results
$500,000 to $1,500,000 est. value
UT

Paving & Site/Civil-UTNG CW UTES Org Parking Improvements
Infrastructure
Bidding
$1,550,000 est. value
Bluffdale, UT 84065

2020 Eagle Mountain Slurry Seal Project
Post-Bid
Eagle Mountain, UT 84005

Center Street Widening
Results
Spanish Fork, UT 84660

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value

Pave the Existing Road to the Green Waste Pad
Post-Bid
Lindon, UT 84042

2020 Micro-Surfacing Project
Results
$350,000 to $400,000 est. value
Orem, UT 84057

2020 Roadway Project
Post-Bid
$2,200,000 to $2,400,000 est. value
Orem, UT 84057

2020 Slurry Project
Results
$500,000 to $550,000 est. value
Orem, UT 84057

Reported 05/25/2021 12:00 AM
Project Title

2021 Roadway Paving Project

Physical Address View project details and contacts
City, State (County) Woodland Hills, UT   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes pulverizing the existing asphalt pavement in place, grade and compact pulverized material as required for new asphalt surface placement along with removal and disposal as needed of excess material, placement of new asphalt and incidental work. Project includes six city street within rights-of-way of Woodland Hills, Utah.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents