Similar Projects
Watermark at Fort Collins
New Construction
Conception
$7,000,000 est. value
Fort Collins, CO 80521

Watermark at Fort Collins
New Construction
Conception
$7,000,000 est. value
Fort Collins, CO 80521

Montava
New Construction
Design
Fort Collins, CO 80522

Montava
New Construction
Design
Fort Collins, CO 80522

Housing Community to be Developed in Loveland
Post-Bid
Loveland, CO

Kinston Residential Phase 1 Public Infrastructure
Results
Loveland, CO 80537

2021 Estes Valley Workforce Housing
Results
Estes Park, CO 80517

Hartford Homes at Trailside
New Construction
Construction
Timnath, CO 80547

Hartford Homes at Trailside
New Construction
Construction
Timnath, CO 80547

Timbervine
New Construction
Pending Verification
Fort Collins, CO 80524

The Lakes at Centerra
New Construction
Pending Verification
Loveland, CO

Hughes Stadium Redevelopment
New Construction
Conception
Fort Collins, CO 80526

Watermark at Spring Creek
New Construction - 3,000 SF
Design
$500,000 to $1,000,000 CJ est. value
Fort Collins, CO

Dakota Glen
New Construction - 32,300 SF
Construction
Loveland, CO

Prospect Road Units and Single Family Home
New Construction
Pending Verification
Fort Collins, CO 80526

Reported 06/14/2021 12:01 PM
Project Title

Heart of the Rockies Christian Church (HRCC "Next Big Thing")

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80525   (Larimer County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Clubhouse/Social Club, Multi-Family Homes, Single-Family Homes
Contracting Method Bids by Invitation.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

44,500 SF - 6 Multi-Family Homes, 2 Stories Above Grade, 12 Units per Building, 2 Multi-Family Homes, 2 Stories Above Grade, 10 Single-Family Homes, 1 Story Above Grade, 24,500 SF New Construction, Clubhouse/Social Club, 2 Stories Above Grade, 20,000 SF New Construction, 11 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents