Similar Projects
Last Updated | 06/17/2022 01:32 AM |
Project Title | Roof Repair at McKinley, Bridges, Dahl and Santee Elementary School |
Physical Address | View project details and contacts |
City, State (County) | San Jose, CA 95116 (Santa Clara County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $700,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work: 1. Remove all debris from the Flat roof and gutters of the Multipurpose Building. 2. Three course repair all penetrations, drains/scuppers and mechanical curbs with KEELock mastic and Polyester soft. 3. Power wash drain valleys on the flat roof and allow to dry completely. Coat the drain valley with white Star and Viking White Spar gravel. 4. Clean and re-caulk all coping joints with Tripolymer Caulk. 3.2.Bridges School, Flat Roof & Gym: Scope of Work: 1. Remove all debris from the flat roofs and the gutters of the Gym metal roof. 2. Three course repair all penetrations, drains/scuppers and mechanical curbs with KEELock mastic and Polyester soft. 3. Power wash drain valleys on the flat roof and allow to dry completely. Coat the drain valley with white Star and Viking White Spar gravel. 4. Clean and re-caulk all coping joints with Tripolymer Caulk. 3.3. Dahl School, Built up Roofs & Metal Roof gutters: Scope of Work: 1. Remove all debris from the flat roofs and the gutters of the Gym metal roof. 2. Three course repair all penetrations, drains/scuppers and mechanical curbs with KEELock mastic and Polyester soft. 3. Clean all gutters on the metal roof and re-caulk all lap joints with Tripolymer Caulk. 3.4.Santee School, Administration Building & wall outside counselor's room: Scope of Work: 1. Remove all debris from the Administration Roof. 2. Three course repair all penetrations, drains/scuppers and mechanical curbs with KEELock mastic and Polyester soft. 3. Power wash drain valleys on the flat roof the length of the front of the Admin. and allow to dry completely. Coat the drain valley with white Star and Viking White Spar gravel. 4. Clean all internal drain valleys on all buildings. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |