Similar Projects
Hickory Head Valves and Actuators
Infrastructure
Bidding
The Villages, FL 32159

Hiawassee Road Force Main Replacement at SR 408
Infrastructure
Bidding
$1,342,842 est. value
Orlando, FL 32835

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Lake Frances Estates Water and Wastewater System Improvements
Results
Less than $6,718,402 est. value
Tavares, FL

Wauchula Hills Phase 6 Water and Sanitary Improvements
Results
$1,826,130 est. value
Wauchula, FL 33873

West Pensacola Street Utility Improvements
Infrastructure
Bidding
Tallahassee, FL 32318

Construction Services for Project Improvements (Phase 1)
Post-Bid
Lakeland, FL 33801

Water and Sewer Emergency Repair Services
Term Contract
Results
Miramar, FL 33025

Procurement of New Flow Meters for Water Plant
Infrastructure
Bidding
Coral Springs, FL

Water and Sewer Stock Water Meters Annual Supply Contract
Term Contract
Post-Bid
Vero Beach, FL 32961

CR846 Water Main Replacement Project
Results
Less than $345,000 est. value
Immokalee, FL 34142

PW-PB - Water Access Structures
Infrastructure
Bidding
Gulf Breeze, Pensacola Beach, FL 32561

Parkside Water Main Replacement Project
Post-Bid
Hollywood, FL

Residential and Commercial Backflow Testing and Repairs
Term Contract
Results
Orlando, FL 32801

Last Updated 07/09/2021 08:31 AM
Project Title

Lead Gooseneck, Water Meter Replacements, and Isolation Valve Installations

Physical Address View project details and contacts
City, State (County) Crystal River, FL   (Citrus County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Crystal River desires to replace Lead Goosenecks, Water Meters, Double Check Backflow Devices, and install Isolation Valves in its distribution system. B. City of Crystal River intends to: 1. Replace 50 Lead Goosenecks. 2. Replace 2,886 Water Meters, Meter Boxes, Curb Stops and fittings. 3. Replace 2,784 Double Check Backflow Devices, Boxes and fittings 4. Install 34 Isolation Valves in its distribution system

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents